Setup And Installation; Machine Transportation; Working Height Adjustment; Tape Head Installation - Eagle T500 Operation Manual

Carton sealer
Table of Contents

Advertisement

3. Machine Setup and Installation
TAKE CARE TO AVOID DAMAGE TO THE MOTOR AND ASSEMBLY WHILE
LIFTING OR TRANSPORTING THE MACHINE!
3.1 Transportation
Use a fork lift or tow motor to remove the machine from its shipping container or pallet.

3.2 Working Height Adjustment

While elevated, install the adjustable legs onto the machine. Set each leg to the same height to ensure the
machine is level when placed onto the ground.
The working height should be set such that the operator is able to comfortably reach the roller table while
maintaining approximately 4in (100mm) of distance from the machine.

3.3 Tape Head Installation

Rest the upper tape head on the carriage placing the notches in the rear of the tape head onto the supporting
shaft. Pull out the draw rod by the key ring, lower the tape head and release the key ring. For the lower tape
head, remove the front supporting shaft. Rest the rear of the tape head on the rear supporting shaft. Place
the front supporting shaft on the angled notches in the front of the tape head and lower the tape head down
guiding the pin into the notches in the frame.
Check tape cutter position and adjust as needed.

3.4 Connect Power Supply

Connect the machine to the power supply.
Note: Prior to connecting the machine to the power supply, verify that the power switch is set to the
'OFF' position and that the work area is clean and clear of any items.
- 5 -

Advertisement

Table of Contents
loading

Table of Contents