Page 3
Contents ③ ② ⑤ ⑥ ⑦ ④ Quantity Name Number ① Slide out awning ② Brackets ③ Hex shaped connecting rods ④ plastic plug Φ5.5x22 pan head self-Drilling screw ⑤ Φ3.9x13 pan head self-Drilling screw ⑥ Φ4.2x32 pan head self-Drilling screw ⑦...
Page 4
Preparation Prepare tools and materials such as ladders, riveting gun, tape measures, markers, and sealants. Before installation, ensure that the walls of your slide box have a backer within the structure of the wall and have sufficient weight bearing capacity. Installation Please make sure the slide out is closed before installation.
Page 5
Step 3 Position the awning rail along the line where the roof and wall meet(Pic 1), or a minimum of 3 inches above the upper edge of the slide out room. Once marked, Φ4.2x32 pan head attach them to the body and secure them with multiple self-Drilling screw.
Page 6
ALL attachments are secure. Warranty Information RecPro Awning Assemblies are covered under warranty for a period of 1 year and includes replacement or refunds for shipping or manufacturing errors. Shipping damage is covered for 30 days after receiving the product. Make sure to inspect the unit when it arrives for shipping damage.
Page 7
806 S. Division St. Bristol, IN 46507 (574) 848-0405 info@recpro.com...
Need help?
Do you have a question about the RP-SAWN-FRM and is the answer not in the manual?
Questions and answers