Installation - HASE LIMA iQ Plus Installation Instructions Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 7

Installation

The following regulations and documents must be observed when installing and remo-
ving the fireplace, connecting the combustion air controller and during operation:
► Building code.
► Chimney calculations as per DIN EN 13384-1 and
DIN EN 13384-2.
► Technical documentation for the stove.
► Local ordinances as well as all necessary, applicable national and
European standards.
The installation of your stove must be done by an suitable specialty company with the
attached installation instructions.
INFO: ACCEPTANCE AND APPROVAL
Before initial operation the stove must be accepted and approved:
► Operate your stove only when the responsible
chimney sweep accepted and approved it.
Mounting positions overview
Catalytic combustors
Power units & flaps
1
3
Temperature sensor
Controller
2
4
1
2
6
3
4
5
Fig. 5
Control panel
5
HASE iQ
6
08/2021
www.hase.de

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sila iq plusSila plus iq plus

Table of Contents