Download Print this page

Dell P2723QE Service Manual page 11

Hide thumbs Also See for P2723QE:

Advertisement

Service Manual
7. Remove FFC:
a.
Remove aluminium foil "1"
S7
b. Lift up FFC cover, grasp on pinch, then remove
light bar cable horizontally
8. Remove PCBA 1:
a.
Remove mylar
b. Remove screws "1~9" with electric screwdriver.
Torque: 5.5 ± 0.5Kgf/cm
9. Remove PCBA 2:
a.
Remove Power Board and IF Board
b. Sperate Power Board and IF Board
10. Remove Front Trim Screws 1:
S10
a.
Remove screws "1~11" on mid frame with
electric screwdriver. Screwdriver torque: 3.5 ±
0.5 Kgf/cm
b. Separate mid frame from panel
11. Remove Front Trim Screws 2:
a.
Remove screws "1~3" with electric
screwdriver. Screwdriver torque: 0.8 ± 0.1
Kgf/cm
b. Separate front trim from mid frame
12. Remove LED
a.
Remove LED from mid frame with jig.
b. Separate lens from LED Board
11

Advertisement

loading