removing salinity on the heat exchanger and applying a rust inhibitor more frequently than once a year.
Sea
correct riser height.
Make sure the outdoor unit is installed level and is stable.
Correct installation
Correct installation
should be higher than the
Sea
Drainage
Sea
Wrong installation
Drainage
stand top is
covered
Wrong installation
unit may become covered in
10
Drainage
Clearance is too small.
causing inadequate
drainage.