Page 1
GEFRAN will not be liable for any damage to persons and/or property, or to the product itself, caused by failure to follow the instructions and observe the warnings given below.
1. PRODUCT OVERVIEW G-Vision products are ideal for field installation in critical areas. The G-Vision product family has been optimized for use as an High-resolution displays and multitouch PCAP touchscreen embedded browser or as a GF designer HD device. with a robust glass front. Power-over-Ethernet (PoE) for maximum simplicity of •...
Page 6
You will have to know the type of unit you are using An example of the information reported is shown below: product model name G-Vision 67-215-54-00-00 code: F086947 year/week of production 2152 serial number AA00016PF7000632495AA manufacturer address Gefran Soluzioni Srl Via Sebina, 74 25050 Provaglio d’Iseo (BS) 81086_G-Vision 67_12-2021_ENG...
3. TECHNICAL SPECIFICATIONS Touchscreen technology Projected capacitive - Multitouch Back-up battery 3V 7mAh Vanadium-Lithium, rechargeable, not user-replacea ble, model VL1220. Flash Hardware clock Clock/Calendar with back-up battery Accuracy RTC (at 25°C) <100ppm ENVIRONMENTAL CONDITIONS -20 ÷ +55°C (vertical installation) EN 60068-2-14 Operating temperature (surrounding air temperature) -30 ÷...
Page 8
Projected capacitive touch screens (PCAP) are suitable for operation with or without gloves. A large number of gloves (rubber gloves, light/heavy leather gloves, disposable latex gloves, etc.) are supported. Due to the variety of commercially available gloves, however, Gefran Soluzioni cannot guarantee all types. 81086_G-Vision 67_12-2021_ENG...
4.2. Installation Environment and procedure Avoid prolonged exposition to direct sunlight to avoid the risk The IP67 is guaranteed only if: of overheating the device. • max deviation from the plane surface to the cut-out: O0.5mm • thickness of the case where is mounted the equipment: The equipment is not intended for installation in contact with from 1,5mm to 6mm corrosive chemical compounds.
5. CONNECTIONS 5.1. Ethernet Port Description Reserved The Ethernet port have two status indicators. Please see description in figure. Green ON: No activity OFF: Valid link has NOT been detected BLINKING: Activity ON: Valid link has been detected 81086_G-Vision 67_12-2021_ENG...
6. POWER SUPPL Y , GROUNDING AND SHIELDING The power supply terminal block is shown in the figure below. Fig. 6.1 Use a shielded CAT 5 cable or higher The earth connection can also be made using the screws located near the connector. A label helps identify the ground Note: Ensure that the power supply has enough power connection.
When the battery is fully charged, it ensures a period of 3 • hardware real-time clock (date and time) months of date and time back-up at 25°C. Battery Fig. 7.1: G-Vision 67-070 IP67 Fig. 7.2: G-Vision 67-101 IP67 81086_G-Vision 67_12-2021_ENG...
Page 17
Fig. 7.3: G-Vision 67-156 IP67 Fig. 7.4: G-Vision 67-215 IP67 ATTENTION ATTENTION Dispose of batteries according to local This device cannot be disposed of as a regulations. domestic waste but according to WEEE European Directive 2012/19/EU 81086_G-Vision 67_12-2021_ENG...
GF Designer HD or GF Project VX are required, they are If you are planning to use your G-Vision with GF Designer HD Gefran IDE software tools that must be properly installed on there are two options to transfer a GF Designer HD runtime a computer running Microsoft Windows.
10. SYSTEM SETTINGS G-Vision HMI products have a system settings interface to To connect enter the address https://IP/machine_config where allow configuration of system options. IP is the IP address of the HMI device. Default username is The user interface of System Settings is based on HTML “admin”, default password is “Gefran123@”.
Page 20
Network Configure IP Address of Ethernet interface and the other network settings like DNS, Gateway, DHCP, Hostname, routing and bridging. Services Enable/disable services. Examples of services are: OpenSSH server, Bridge, Cloud, Router, SNMP and logging. Management Update of BSP components (Main OS, Config OS, Boot loader, XLoader), check for partitions consistence, update of splash screen, information about usage...
11. UNPACKING AND PACKING INSTRUCTIONS Fig. 11.1 Fig. 11.2 To repack the unit, please follow the instructions backwards. 81086_G-Vision 67_12-2021_ENG...