Connecting The Pre-Filter To The Dryer; Connecting The Post-Filter To The Dryer - Beko DRYPOINT ACC 46 Instruction Manual

Table of Contents

Advertisement

Section 4: Mechanical Installation

Connecting the pre-filter to the dryer

45 SCFM - 110 SCFM models
Attach CLEARPOINT pre-filter (shipped loose for field installation)
utilizing a pipe nipple and/or pipe adapter (user supplied).
Pipe away condensate with tubing from drain outlet. Ensure
condensate is drained into an oil/Water Separator.
Fit any additional filtration and/or ancillary equipment.
Pre-filter is typically supplied with a float drain installed in the bowl
drain port. This can be replaced with the optional BEKOMAT
All tubing should be secured up to the point of drain to
prevent whipping during discharge.
It is recommended that a bypass line including an 0.01 micron filter is
installed, as per figure 4.1.

Connecting the post-filter to the dryer

45 SCFM - 110 SCFM models
Attach CLEARPOINT post-filter (shipped loose for field installation)
utilizing a pipe nipple and/or pipe adapter (user supplied).
Fit any additional filtration and/or ancillary equipment.
Post-filter is typically supplied with a manual drain installed in the bowl
drain port.
17
Section 4: Mechanical Installation
.
®
All tubing should be secured up to the point of drain to
prevent whipping during discharge.
Available on DMC models only.
Install optional solenoid drain valve onto pipe adapter(s)
etched into the side of the drain valve body.
Pipe away condensate with tubing from drain outlet.
Ensure condensate is drained into an oil/water separator.
All tubing should be secured up to the point of drain to
prevent whipping during discharge.
Figure 4.9: Connecting a pre-filter
Figure 4.9: Connecting a pre-filter
s
drain.
Figure 4.10: Connecting filter drain
.
Figure 4.10: Connecting a post-filter
|
|
18
Heatless Desiccant Dryers |
Instruction Manual

Advertisement

Table of Contents
loading

Table of Contents