The dual control interfaces mimic each other, however the control interface most recently accessed has the priority over the other. For your dual control interface, you may have an option to use two CP05, two CP10 or one CP05 and one CP10, depending on your situation and requirement.
Page 6
CP05 & CP10 CONTROL INTERFACE INSTALLATION GUIDE Step 3: Attach the Lateral Sliding Plastic Brackets (one on each side) unto the Control Interface and push tight against the mounting panel: Control Interface as mounted unto the panel Panel 2 x Lateral Sliding...
Page 8
CP05 & CP10 CONTROL INTERFACE INSTALLATION GUIDE DATA CABLE AND RJ12 PLUG PREPARATION: Option 1 - Data Cable with RJ12 plug at both end: 6 Core Flat 7/0.12 (AWG28) Telephone Cable 50m Max. Length - Field Scope VIEW VIEW (Installer to Provide)
Page 10
16.5 Supply Temp: Comp Rev Vlv (To be Purchased Separately) * CP05 or CP10 may be used as Secondary Control Interface. Refer Control Interface mounting procedure on pages 6-8. CP05 - CP10 Control Interface Insert Doc. No.0525-035 Ver. 6 220307...
Page 12
CP05 & CP10 CONTROL INTERFACE INSTALLATION GUIDE When all the changes have been done, MAKE “Ok” as “Yes” using the “ ” Button or “ ” Button and then press Enter “ ” Button: P: 01 Adr Priv/Shared Trm1 32...
Need help?
Do you have a question about the CP05 and is the answer not in the manual?
Questions and answers