7.3. BW7 Start-up and test

1)
Start the water supply to the pump. Check for any leakages.
2)
Bleed the pump.
3)
Install the power cable, and turn on the system.
4)
Wait for the OFF LED to emit constant light (20-30 seconds).
5)
Installation on display
- Set the display for the correct machine type in settings. The type of machine is stated on the identification plate.
- Set the time and date in settings
- Set user-specific settings
6)
Test the unit.
34
Install cables and plugs
(see the section on cable
installation).
- Install the display plug
on the inverter terminal
"modbus".
- Install 4 sensor cables on
the sensors.
- Use strips to collect the
cables.