Bw4 Start-Up And Test - Nilfisk-Advance Hybrid Directions For Use Manual

Inverter replacement kit
Table of Contents

Advertisement

Available languages

Available languages

7)

6.3. BW4 Start-up and test

1)
Start the water supply to the pump. Check for any leakages.
2)
Bleed the pump.
3)
Install the power cable, and turn on the system.
4)
Wait for the OFF LED to emit constant light (20-30 seconds).
5)
Installation on display
- Set the display for the correct machine type in settings. The type of machine is stated on the identification plate.
- Set the time and date in settings
- Set user-specific settings
6)
Test the unit.
28
Install the motor cable and
the motor temperature
cable.

Advertisement

Table of Contents
loading

Table of Contents