Download Print this page

Tate Grid User Installation page 2

Ceiling system

Advertisement

Introduction
Thank you for choosing Tate Grid. The purpose of this guide is to provide you with a reference for typical
installation situations. We would be interested in hearing any comments you have on this installation
manual, product, or overall experience. Please call or email Technical Services:
Phone: 410-799-4200
Email: TateInfo@tateinc.com
Safety
2 or more people are required for handling some of the pieces for this system.
Wear personal protective equipment (PPE) when drilling, cutting, or installing. PPE includes
gloves, safety eyeglasses, hardhats, etc.
Do not put a load on the system until the installation is complete.
Be sure all bolts, nuts, and threaded rods are properly tightened down as described in this
guide.
Cleaning
To clean Tate Grid components please use a common non-abrasive mild detergent containing less than
0.5% phosphate and water, applied using a sponge. The components should be dried using a soft towel.
If solvents are required to remove materials not soluble in water such as petroleum products, the
following solvents can be used: Isopropyl alcohol, denatured alcohol, mineral spirits or methanol.
Main Runner Alignment
The main runners are not symmetric, they must all be oriented in the same direction. Be sure that all
runs of main runners are oriented in the same direction or the grid will not align properly.
Cross Tee Alignment
For 2'x2' grid systems, the 4' tees should first be installed between the main runners and oriented such
that the witness notches at the ends of the 4' tees are all oriented in the same direction. This will ensure
that the 2' tees will align properly and parallel to the mains.
7510 Montevideo Road
Jessup, MD 20794
410-799-4200
Tate Grid: Ceiling System
© 2017 Tate Inc.
2

Advertisement

loading