5-3 Connection method
(1) Connections in the power supply cord.
1. Connect the power supply cord to the power supply terminal-block and fix it in-place with a tie-wrap.
Connect a single phase 200V AV (220, 230, 240V) to
As
E
is the GND terminal, be sure to ground the earth wire.
2. Connect the transmission line to the transmission terminal-block and fix it in-place with a tie-wrap.
Use a Ω1.6 (AWG 14) or above two-wire cable for the transmission line.
CAUTION : Never connect the power supply cord to the transmission terminal-block.
TERMINAL-BLOCK
FOR TRANSMISSION
TRANSFORMER
Tie-wrap
(2) Connection method of centralized remote controller and power supply board.
1. Connect the centralized remote controller and power supply board with a non-polar, two-wire cable.
To adaptor's
terminal-block
Centralized remote
controller
2. Wiring diagram
Centralized
remote controller
TERMINAL-BLOCK
OF POWER SUPPLY
Transmission
Tie-wrap
Fuse(5A)
POWER
E N G A G E D
ON/OFF
G R O U P
1 2 3 4 5 6 7 8 9 10
G R O U P
AHEAD
BACK
S E L E C T I O N
P R O G R A M
ACTIVE
A C T I V E B Y P A S S
T I M E R
BYPASS
C O N T R O L L E R
DUAL
D U A L C E N T R A L
CENTRAL
O P E R A T I O N
10 9 8 7 6 5 4 3 2 1
Non-polar,
two-wire cable
Power supply
board
.
L N
T
(Y)
(W)
(BR)
(R)
(O)
Wiring has to be changed when
a 200,230 or 240V power is used.
Power supply board box
To adaptor's
terminal-block
3. Be sure to set the maximum address number with the
dipswitch SW17 on the centralized remote controller.
POWER
E N G A G E D
ON/OFF
G R O U P
1 2 3 4 5 6 7 8 9 10
G R O U P
BACK
AHEAD
S E L E C T I O N
P R O G R A M
ACTIVE
A C T I V E B Y P A S S
T I M E R
BYPASS
C O N T R O L L E R
DUAL
D U A L C E N T R A L
O P E R A T I O N
CENTRAL
10 9 8 7 6 5 4 3 2 1
POWER
5A
SUPPLY
L
N
Dip switch
SW17
81

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents