Rigging Instructions; Condensate Drain Connection; Duct Connection - LG AK-C3608H00 Installation Manual

Table of Contents

Advertisement

INSTALLATION OF UNIT
14

Rigging Instructions

Attention to riggers
• Insert 2" nominal pipe through holes in the base rail as shown in the figure below for slings.
• Holes in base rail are centered around the unit center of gravity.
• Use wooden pallet or spreader bar when rigging, to prevent the slings from damaging the unit.
• Rollers may be used to move the unit on the roof or ground.
CAUTION
!
All panels should be in place when rigging.
Compressor
End

Condensate Drain Connection

Use standard PVC pipe with NPT connection for the condensate drain. Provide a 'P' trap
immediately at the condensate drain connection.
Piping has to be sloped away from the unit.
Remember to remove the drain hole plug before operating the unit. Avoid bends & elbows.

Duct Connection

The units can be connected to the ducting in horizontal configuration. Connect ducting using
flexible duct connection. The duct should be properly designed and the drive package should
match the required CFM & corresponding external static pressure.
NOTE
Avoid abrupt changes in size and/or direction of duct to ensure proper unit performance.
LIFT
Must be 2" nominal pipe thru unit
for slings to avoid base damage.
LIFT
Spreader bar
Proper clearance to be provided

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ak-c4208h00Ak-c4808h00Ak-c3609h00

Table of Contents