Project Source F201E514CP Manual page 8

Tub and shower faucet
Table of Contents

Advertisement

Available languages

Available languages

ASSEMBLY INSTRUCTIONS
10. Check for leaks at tub stub-out pipe. Next wrap
stub-out pipe with thread seal tape and install
spout (G).
11. Check for leaks at shower arm (A). Next divert
water to the shower to flush out the water lines.
12. Install shower head (C) to shower arm (A). Hand
tighten shower head.
10
10
11
11
12
12
8
all
G
A
A
12
C

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F201e521cp14516970900330

Table of Contents