Download Print this page

Blanco drink.soda EVOL-S Pro 526255 Assembly Instructions Manual page 28

Hide thumbs Also See for drink.soda EVOL-S Pro 526255:

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 24
EN
28
1x 19 mm
blue
440 mm
200 mm
Required tools:
- Pliers
- Wrench, width 19 mm
Tube for cooled/filtered water:
The blue connection tube is supplied
unassembled with the mixer tap. The tube must
not be kinked or shortened, as this will prevent
the unit from functioning properly!
The spacing between the mixer tap and
refrigeration unit should not exceed 80 cm.
The tube must not be strained. For repairs or
cleaning purposes, it must be possible to pull
the refrigeration unit forward, so there should be
some tube reserve in the base cabinet.
Refrigeration unit dimensions:
Height: 440 mm
Width: 200 mm
Housing depth: 490 mm
Depth incl. spacer at rear: 530 mm
When positioning the unit in the base cabinet,
make sure that there are no corner valves
behind the unit.
Transport:
When transporting the system, make sure
that the CO
cylinder has been removed
2
and the unit is emptied.
6 hours waiting time:
After the unit has been transported to its
installation site, it must be left to settle for
6 hours.
The installation can be prepared but the power
supply for the refrigeration unit may only be
connected after a waiting time of 6 hours.

Advertisement

loading

This manual is also suitable for:

Drink.soda evol-s pro 526633