2. Mount cutting unit to the pull frame with both shoul-
der bolts.
3. Slide the cutting unit under the pull frame while
hooking the lift roller onto lift arm (Fig. 21).
4. Connect center ball joint on pull frame to the carrier
frame (Fig. 21).
5. Remove the plastic cap from the bearing housing.
Greensmaster 3200/3200–D
6. Install hydraulic motor to bearing housing as follows
(Fig.
A. Coat spline shaft of the motor with clean No. 2
multipurpose lithium base grease.
B. Install motor by rotating the motor clockwise so
the motor flanges clear the flange head screws.
C. Rotate the motor counterclockwise until the mo-
tor flanges are encircling the flange head screws.
Tighten flange head screws.
Page 8 – 17
Cutting Units