Page 1
(4) 2”, 3”, 4”, 5”, 6” or 8” high legs (depending on style of Roverpet Puppy Rail System ordered) Assembly Procedure Special Notes: If the Roverpet 4’x4’ whelping box consists of a door panel, it needs to be configured with the door located on the right to allow door hinge clearance.
Page 2
6.) Clip the #PR48LB connecting ends around the vertical bars. 7.) With the one side of the #PR48LB installed on the vertical bars, slide the high-side of the Roverpet Puppy Rail System down into the Roverpet whelping box. Make sure the #PR48LB connecting ends are installed in the same manner as in the prior step.
Page 3
8.) Push the whole Roverpet Puppy Rail System down until all four legs are resting on the Roverpet whelping box floor. Note: Pig Rails can reduce the risk of possible suffocation. Note: Puppies should be watched at all times when small.
Need help?
Do you have a question about the 44PR and is the answer not in the manual?
Questions and answers