Setting the AC Power Fault Reporting Delay

Normal selection for reporting loss of AC is 6 hours.
The OFF position is for test purposes only and the normal position for switch 9 is ON. For testing the Low
AC reporting, you can temporarily turn switch 4 OFF without removing power.
Remember to turn the switch ON when testing is complete.
ON
OFF
7
9
6
8
6
7
8
9
6
7
8
9
6
7
8
9
Figure 5-5. Setting DIP Switch 9 and 10
447179 Issue 1 Rev. A
Switch 9 OFF & Switch 10 OFF:
AC power fault reporting will not be delayed.
10
Switch 9 ON & Switch 10 OFF:
AC power fault reporting will be delayed 6 hours.
10
Switch 9 OFF & Switch 10 ON:
AC power fault reporting will be delayed 15 hours.
10
Switch 9 ON & Switch 10 ON:
AC power fault reporting will be delayed 24 hours.
10
firealarmresources.com
15073 OWNER'S MANUAL
33

Advertisement

Table of Contents
loading

Related Products for Faraday RSE-300

This manual is also suitable for:

15073

Table of Contents