Summary of Contents for Forpark Australia FREESTANDING TIMBER

  • Page 1 FREESTANDING TIMBER INSTALLATION MANUAL...
  • Page 2 AS 4685.0.2017 Playgrounds and playground equipment – Part 1: Development, slide installation, inspection, maintenance and operation You may be interested to know that Forpark Australia is a family-owned Australian company and that we are the largest in-house manufacturer of playground equipment in Australia.
  • Page 3: Prepare The Site

    Forpark recommends General Purpose Concrete. This is a concrete with a compressive strength of 20MPa (at 28 days) or higher. The concrete used in playground footings should only be mixed and/or worked by a suitably experienced person following supplier/manufacturer’s instructions INSTALLATION MANUAL FREESTANDING TIMBER 10 May 2022...
  • Page 4 Dig two holes for the footings (use the Plank Walk legs as a template to locate holes).Screw legs with 4 coach screws 10x50 per leg. Keep legs vertical, concrete and secure the place for 24 hours. INSTALLATION MANUAL FREESTANDING TIMBER 10 May 2022...
  • Page 5 Insert into the hole, ensuring the depth is correct to the finished ground level. Keep vertical, concrete and secure the place for 24 hours. Trim all protruding bolts, remove sharp edges and spray the bare metal with galv spray. INSTALLATION MANUAL FREESTANDING TIMBER 10 May 2022...
  • Page 6 Concrete and secure the place for 24 hours. Attach swing chains to top bar with D shackles. Cut tag and file sharp edges. Trim all protruding bolts, remove sharp edges and spray the bare metal with galv spray. INSTALLATION MANUAL FREESTANDING TIMBER 10 May 2022...
  • Page 7 Concrete and secure the place for 24 hours. Attach swing chains to top bar with D shackles. Cut tag and file sharp edges. Trim all protruding bolts, remove sharp edges and spray the bare metal with galv spray. INSTALLATION MANUAL FREESTANDING TIMBER 10 May 2022...
  • Page 8 The height varies from 2400 to 2700 above ground level. Concrete and secure the place for 24 hours. Trim all protruding bolts, remove sharp edges and spray the bare metal with galv spray. Tee Pee Anchor INSTALLATION MANUAL FREESTANDING TIMBER 10 May 2022...
  • Page 9 Ph: (07) 3390 2188 www.forparkaust.com.au Copyright - © Forpark Australia 2022. All product, product specifications and data are subject to change without notice to improve reliability, function, design or otherwise. Every effort is made to ensure information contained in this catalogue is accurate E&OE.