Forpark recommends General Purpose Concrete. This is a concrete with a compressive strength of 20MPa (at 28 days) or higher. The concrete used in playground footings should only be mixed and/or worked by a suitably experienced person following supplier/manufacturer’s instructions. INSTALLATION MANUAL SPRINGS 29 September 2020 INSTALLATION MANUAL FREESTANDING SPRINGS AND ROCKERS 29 September 2020...
24 hours before bolting the springs (22mm) onto the animal stands (base). Assemble the top sections of the item as shown. Use Loctite for all bolts. INSTALLATION MANUAL SPRINGS 29 September 2020 INSTALLATION MANUAL FREESTANDING SPRINGS AND ROCKERS 29 September 2020...
Remove frame with springs. Leave the concrete to set for at least 24 hours before bolting the 2 springs (20mm) and one spring (24mm) onto the animal stands (base). Use Loctite for all bolts. INSTALLATION MANUAL SPRINGS 29 September 2020 INSTALLATION MANUAL FREESTANDING SPRINGS AND ROCKERS 29 September 2020...
24 hours before bolting the spring (22mm) onto the stand. Assemble the top section of the item as shown and attach to the spring. INSTALLATION MANUAL SPRINGS 29 September 2020 INSTALLATION MANUAL FREESTANDING SPRINGS AND ROCKERS 29 September 2020...
The cross plate should be fastened across the top of the beams at the same time the beams are attached to the spring plate using 80mm cup head bolts and stainless steel cap nuts. INSTALLATION MANUAL SPRINGS 29 September 2020 INSTALLATION MANUAL FREESTANDING SPRINGS AND ROCKERS 29 September 2020...
“Single Rockers”, fitting the shapes in- between the beams. Fasten the seats to the beams using 100mm cup head bolts and cap nuts di cast. INSTALLATION MANUAL SPRINGS 29 September 2020 INSTALLATION MANUAL FREESTANDING SPRINGS AND ROCKERS 29 September 2020...
(with the cap nut pointing down through the seat). Attach the stirrups to the head and tail using 17mm tri-lobes and aluminium cap nuts. INSTALLATION MANUAL SPRINGS 29 September 2020 INSTALLATION MANUAL FREESTANDING SPRINGS AND ROCKERS 29 September 2020...
Page 10
When there are plastic panels use for seat attachment S/S cap nuts with S/S washers ½” on panel side and trilobes 10x25 with S/S washers M10 on seat casting side as shown. Use tri-lobes 10x17 and T-nuts for rails as shown. INSTALLATION MANUAL SPRINGS 29 September 2020 INSTALLATION MANUAL FREESTANDING SPRINGS AND ROCKERS 29 September 2020...
Assemble the top section of the see saw as shown and attach to the upright. All 8 bolts z/p soc screw must be well tightened and secured with Loctite. INSTALLATION MANUAL SPRINGS 29 September 2020 INSTALLATION MANUAL FREESTANDING SPRINGS AND ROCKERS 29 September 2020...
Loctite Once the concrete has set, lift the top section and place on top of the upright and attach as shown. INSTALLATION MANUAL SPRINGS 29 September 2020 INSTALLATION MANUAL FREESTANDING SPRINGS AND ROCKERS 29 September 2020...