Assembly Of The First Stage In The Bottle Valve - TDS OCEANUS User Manual

Table of Contents

Advertisement

ST
1
STAGE
MAXIMA PRESSURE WORK
AVERAGE PRESSURE
NUMBER AND SIZE OF PORTS
ANSTI TESTED DEPTH
CERTIFIED DEPTH
GAS COMPOSITION
GAS COMPOSITION
HP PORTS
LP PORTS
3.
PREPARATION AND CONFIGURATION
TDS recommends that you take your regulator to a TDS Licensed Technician for the
installation of any ancillary elements, including instrumentation, LP quick discon-
nect hoses, and alternative air sources.
CAUTION:
when the user assembles or disassembles the SCUBA device, that could cause
damage to the product and subsequently cause injury to the diver.
3.1

ASSEMBLY OF THE FIRST STAGE IN THE BOTTLE VALVE

3.1.1
INT TYPE CONECTOR
1.- Partially loosen the first-stage regulator yoke screw so that the filter dust cap
and air inlet can be removed.
2.- Remove the protective cover of the bottle valve.
3.- With the bottle valve outwards, release a small amount of air from the bottle by
turning the steering wheel counterclockwise to open the valve only slightly. When
you hear air coming out, immediately close the valve. This will remove any moisture
or dirt that may be inside the outlet opening of the bottle valve.
4.- Check the condition of the O-ring of the bottle valve.
Instructions
- User's manual ■ 7
DIAPHRAGM
INT: 3300 PSI / 232 Bar
DIN: 4350 PSI / 300 Bar
140 +/- 5 PSI (9.65 +/- .35 BAR)
2 HP 7/16", 5 MP 3/8"
80 METERS
50 METERS
AIR (OCEANUS, PROTEUS, TAC BLACK)
NITROX (GULL BLACK)
1 (OCEANUS) 2 ( PROTEUS, GULL, TAC BLACK)
3 (OCEANUS) 4 (PROTEUS, TAC BLACK) 5 (GULL)
1
Stage -
2
Stage
- Octopus
ST
N D
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

ProteusGull zTac black

Table of Contents