Vaillant VEI 300/1 MW Operating And Installation Instructions page 9

Infrared radiant heater
Table of Contents

Advertisement

3 For the competent person
3.3.4
Minimum clearances
Conditions: Wall-mounting
B
A
200 mm
B
200 mm
C
200 mm
Always observe the minimum clearance (E) between
the back panel and the wall. This minimum clearance is
determined by the retaining brackets.
Conditions: Installing on the ceiling
A
A
200 mm
B
200 mm
C
200 mm
Always observe the minimum clearance (E) between the
back panel and the ceiling. This minimum clearance is
determined by the retaining brackets.
Make sure that air can circulate continuously between the
back panel and the wall or ceiling.
8
E
D
B
D
400 mm
E
26 mm
C
D
400 mm
E
26 mm
3.3.5
Using the mounting template
Use the enclosed mounting template to determine the
position of the drill holes for mounting the product on the
wall or ceiling.
3.3.6
Installing the product
1.
Drill the holes at the previously marked positions.
2.
Use suitable rawl plugs, hexagon head screws and
washers.
3.
Insert the rawl plugs into the holes and screw in the
screws with the washers.
4.
Leave a gap of max. 4 mm between the washer and the
wall or ceiling.
5.
Slide the product onto the screws previously inserted,
between the washers and the wall or ceiling, and hold
the product firmly in place.
Conditions: Installing on the ceiling
Mount the product with the help of a second person.
Operating and installation instructions 0020255239_00
max.
4 mm

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents