Page 1
DCM Solution S.A. Sanitizing tunnel ESV700 Installation Manual All information contained in this document, including illustrations and specifications are reliable at the date of its publication but is subject to change without notice. Versión: 1.0 05/01/2021...
Page 2
DCM Solution S.A., assumes no liability for any inaccuracy, error or omission in this manual. Under any circunstances, DCM Solution S.A., will be liable for direct, indirect, special, incidental or consequential damages resulting from any defect or omission of this manual, even if the possibility of damage was advised.
ESV700 Sanitizing tunnel 2.2.4 Electric power supply Voltage 12VDC @ 5A 2.2.5 Electric consumption Electric consumption 50 W max 2.2.6 Environmental conditions Operating Temperature +0 °C to +40 °C Storage Temperature -10 °C to +55 °C Relative Humidity 95% non-condensible maximum 2.2.7 Weight...
ESV700 Sanitizing tunnel 4.3 Unpacking 1. Place the package on the floor without turning it around. 2. Take the uppercover off. 3. Remove the styrofoam and grasp the platform. www.dcm.com.ar Installation Manual Page.: 9of23...
Page 10
ESV700 Sanitizing tunnel 4. Turn the platform around and place it where the sanitizer will be installed. 5. Take the ceiling out of the box. 6. Unscrew the cover, open it and take the 4 railings. 7. Put back the cover and rescrew.
Page 11
ESV700 Sanitizing tunnel 8. Remove the sidewalls from the box. 9. Discard packaging. www.dcm.com.ar Installation Manual Page.: 11of23...
Page 12
ESV700 Sanitizing tunnel NOTA: You will find each item in its position. For each step you will have to unscrew it, put thepart and screw it back.. www.dcm.com.ar Installation Manual Page.: 12of23...
ESV700 Sanitizing tunnel 4.4 Assembly 1. Open the full sidewall's doors. 2. Unscrew the nuts. 3. Remove the raills. www.dcm.com.ar Installation Manual Page.: 13of23...
Page 14
ESV700 Sanitizing tunnel 4. Pick up the 4 railings and attach the monthesidewalls as shown in the images. 5. Join the sidewalls to the platform as shown in the illustrations and screw. www.dcm.com.ar Installation Manual Page.: 14of23...
Page 15
ESV700 Sanitizing tunnel 6. Put the top frame in position, open the doors of both side walls and screw. 7. After placing the top frame, connect the 4 hoses of the sidewalls to the top frame's coupling. www.dcm.com.ar Installation Manual...
Page 16
ESV700 Sanitizing tunnel 8. Place each rail in its correct position as shown in the images, matching the holes painted in red. www.dcm.com.ar Installation Manual Page.: 16of23...
Page 17
ESV700 Sanitizing tunnel 9. Open the sidewalls' doors and screw from the inside. 10. For screwing tank'sside rail, move the tank by cutting the seal. After fixing the rail, put the tank back in position. www.dcm.com.ar Installation Manual Page.: 17of23...
ESV700 Sanitizing tunnel 5 Wiring 5.1 Pre requisites For equipment a power supply of 12Vdc 5Amp (not provided) should be used. For greater electrical safety of the installation it is necessary to comply with the following: Power to equipmentmust come from an electrical board (not provided).
ESV700 Sanitizing tunnel 2. Connect the electric supply to the terminal block as shown in the illustration. 6 Start up 6.1 Filling the tank Fill the tank directly through the filter placed on the top of the tank. www.dcm.com.ar Installation Manual...
ESV700 Sanitizing tunnel 6.2 Purge Connect the unit to the power source with 12vDC. Hold down the manual button, do not release until liquid comes from each of the 4 spray nozzles. www.dcm.com.ar Installation Manual Page.: 20of23...
ESV700 Sanitizing tunnel 6.3 Pressure valve In case of willing to correct the pressure, you can change it through the pressure valve as shown in the pressure valve page. www.dcm.com.ar Installation Manual Page.: 21of23...
ESV700 Sanitizing tunnel 7 Maintenance 7.1 Spray nozzle cleaning 1. Pull out the nozzle from the product while holding down the blue part. 2. Disassemble the nozzle very carefully as it has tiny components inside. 3. Clean all the components (Do not use chemical solvents).
ESV700 Sanitizing tunnel 7.2 Desagote plataforma Do not obstruct the water output. Juan de Garay 3942 (1636) Olivos - Buenos Aires República Argentina Tel: (+54 11) 4005-5881/ 4711-0458 Email: info@dcm.com.ar www.dcm.com.ar Installation Manual Page.: 23of23...