Download Print this page

Mastervolt Mass Combi 12/2000-100 Quick Installation page 3

Advertisement

Quick installation
Connect the AC and DC wiring as indicated below, but do not place the DC fuse yet!
8
Ground Fault Circuit
Interrupter (GFCI) /
Circuit Breaker max. 50Amps
AC INPUT
L
N
GND
Incoming AC source
Recommended torques (all models):
Main DC connections: 130 - 175 In-Lbs
AC connections: 13 - 16 In-Lbs
9
Connect remote control panels (optional) and battery temperature sensor as indicated below.
Remote
connection
(ICC panel)
Positive battery
terminal
ICC panel (optional)
+
Batteries
Mastervolt International B.V,
P.O.Box 22947, NL-1100 DK Amsterdam, The Netherlands.
All manuals and user guides at all-guides.com
Mass Combi 120V
AC output
POWER
AC input
(only available when grid is
connected to AC INPUT)
Connector for
QRS232
temperature
connection
sensor
1 - 2 - 3 - 4
REMOTE
TEMP . SENS
QRS232
POS
BATTERY
+
Service
Temperature sensor
AC output
SHORT BREAK
Positive battery
terminal
+
Ground Fault Circuit
Interrupter (GFCI)
L N GND
POWER
SHORT BREAK
(switches between AC-
INPUT and inverter power)
PARALLEL
connection
MASTERBUS
NEG
+5A
Negative battery
terminal
Tel.: +31-20-3422100
Email: info@mastervolt.com
English
Negative battery
terminal
DC fuse
+
L N GND
Service
Batteries
APC panel (optional)
Masterlink MICC (optional)
Web: www.mastervolt.com v1.0 080731US

Advertisement

loading

This manual is also suitable for:

Mass combi 12/4000-200Mass combi 24/2000-60Mass combi 24/4000-120