Chapter3. System Setup; Power Installation Procedure - NOVAKON X17 Series User Manual

Table of Contents

Advertisement

Chapter3. System Setup

3.1 Power Installation Procedure

Step 1. Connect a power cord to the power adaptor.
AC to DC power adaptor specification
1. Input support voltage: 110V ~ 240V AC power , 50~60Hz
2. Output support voltage: 12V DC power @5A MAX
3. 0~40 degree C operating temperature
Step 2. Connect another male plug of the power cord to an electrical outlet.
Step 3. Connect the Phoenix Connector Terminal into the system's Power Input
Connector.
WARNING:
1. After plugging phoenix connector , be sure to fasten the two
screws to lock the connector.
2. White cable stands for 12V , block cable stand for GND. Make
sure you plug connector in correct direction.
Page 13

Advertisement

Table of Contents
loading

Related Products for NOVAKON X17 Series

This manual is also suitable for:

X17-pX17-r

Table of Contents