Dismantling And Disposal - Wolf THERM CONNECT Operation & Maintenance Instructions Manual

Run around coil systems
Table of Contents

Advertisement

THERM CONNECT
10
WOLF run around coil systems

10.03 Dismantling and disposal

Dismantling - Disassembly
Before starting dismantling, the air handling unit or the consumers installed in it must be disconnected from the
power supply. All current-carrying connection lines must be removed by a qualified electrician.
Furthermore, all media-carrying components must be completely drained. This must be carried out by a specialist
company, which must ensure the proper disposal of
Water with antifreeze
Refrigerant in evaporator piping and condenser
compressor oils
Attention!
System parts are under pressure!
The AHU can then be dismantled on site into the individual unit modules or into its individual parts. This should also
be carried out by a specialist company that is familiar with the environmentally friendly disposal of the individual
parts.
Disposal must be carried out in accordance with the applicable, relevant and local environmental and
recycling regulations of your country and municipality.
The following materials are used in our air handling units
Casing – frame profiles, cladding panels and built-in parts:
Hot-dip galvanized sheet steel
Stainless steel 1.4301
Aluminum AlMg
Copper
Brass
PVC
Sealing profiles:
Rubber compound profiles EPDM
Fluoroelastomers FKM
PVC
Sealing compounds:
Polyurethane
Insulating material:
Mineral wool
Soundproofing mats
Sandwich panels (coated, hot-dip galvanized steel sheet, polyurethane)
Armaflex
26

Advertisement

Table of Contents
loading

Table of Contents