Important Steam Bath Safety Guidelines I. Important Steam Bath Safety Guidelines: G) The Facility manager should fully understand the causes, symptoms, and effects of hyperthermia A) Do not permit children to use the steam bath unless which may be described as follows: Hyperthermia they are closely supervised at all times.
C) Provide an inline fuse/circuit breaker as required sized in accordance with specification plate. Do not install a GFI Ground Fault Interrupter to this equip- ment. Figure 1 - Dimensional Drawing for Heavy Commercial Steam Generator (HC-9 thru HC-18) Operating Pressure Auxiliary Manual Reset...
Rough-In IV. Rough-In: Figure 2 - Plumbing Diagram be used for draining steam generator.The indirect drain must be in accordance with local A) Plumbing Rough-In: plumbing codes. 4) Rough-in a drain line using ¾" pipe routed to an The heavy Commercial “HC” Steam Generator indirect waste from the Safety Relief valve.
THE STEAM GENERATOR MUST BE TURNED void the warranty. For convenient access mount the OFF. steam generator on the optional Steamist stand designed specifically for the steam generator. 1) Locate and remove six (6) screws securing the access cover to the gray electrical power box.
Digital Command Center Installation VI. Digital Command Center Installation: BYPASS CONTROL wire from the selected mount- ing area to the control module on the steam genera- WARNING: All the electrical power to the steam genera- tor. The USER BYPASS CONTROL mounts to tor MUST be turned OFF before proceeding with instal- 2-1/8”...
Digital Commercial Control Package Operation VII. Digital Commercial Control Package Operation: B) Programming the DIGITAL COMMAND CENTER can be broken down into 3 separate sections, SET This control is designed to maximize energy savings by EVENT, SET VALUE, and SET CLOCK. The allowing the facility manager set a lower operation buttons on the control are grouped accordingly.
Digital Commercial Control Package Operation (d) MAX CYCLE TIMER is used to set the programmed to “:00”, this feature will be duration that the system will be in MAX disabled and the USER BYPASS TEMP mode after the USER BYPASS CONTROL(S) will be disabled.
Digital Commercial Control Package Operation EXAMPLE 1 shows the club opening at 7AM. Assuming control switches back to IDLE. Then at 3PM it gets busy it is not busy the first hour so the mode is selected as again and switches to back to MAX. At 7PM we switch IDLE.
Page 11
Digital Commercial Control Package Operation 4) Programming SET EVENT: To program the and observing the time settings. If you SET EVENT section, first press the PROG# made no changes simply press the enter button on the Digital Command Center. The button to return to normal or it will return in display will flash the current program number 30 seconds.
Wiring Diagram Note: All factory wires are 18AWG unless otherwise noted. *Note: CN109 Jumper open = F° Jumper closed = C° 120V, 15AMP Branch Circuit Power and heater wire gauge are set by the factory. Turn OFF power if making this change Command Module CN102 CN101 12VAC...
Need help?
Do you have a question about the HC-9 and is the answer not in the manual?