Indoor Unit Installation - Zephir ZUW9000 Manual

Table of Contents

Advertisement

Available languages

Available languages

Fixing installation panel 
 Dismantle the metal installation board of the indoor unit. Adjust the mounting panel to horizontal position.
 Drill holes and insert plastic expansion tubes at the appropriate locations on the wall and fix the installation board on
the wall with M5x30 screws and washer 6. Ensure that there must be at least 4 fixed points in the wall. Ensure
installation board to horizontal position.
 Drill holes as Fig. 4 shows. The hole, 80mm in diameter, should slightly slide down outwards.
 Cut PVC tubes at a slight angle in the length shorter than wall thickness and inset it into the hole.( Fig.5)
 Mount the wall cap.
Notes: Left chart is available for the position of drain hose, refer to Fig.7
Right chart is available for the position of drain hose, refer to Fig.9
Indoor unit installation 
The tube may be connected in several directions as below shown figures.
1. Connecting right back tube (similar to right lower tube) (Optional, Refer to
Fig.7)
Pull out the tubing from bottom of the chassis; and connect the
drainpipe. Strap the joint of tubing reliably.
Lead the connecting wire to the indoor unit (Do not connect to the
power).
Strap together the tubes, discharge pipe and connecting wire with
adhesive tape. The discharge pipe is put at the below.
Remove the board which is on the chassis.
Check if the connections are reliable.
Mount the indoor unit on the two hooks at the upper part of installation board.
2. Connecting left back tube (similar to left lower tube). (Optional, Refer to Fig9)
Move the discharge tube to the left side, and discharge cap to the right side.
Fix the tubes in the slot of the indoor unit with the fix clamp.
The following mounting steps are the same as those in "1. Connecting right back tube."

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zuw12000Zuw18000Zuw24000

Table of Contents