ABB RVC Installation And Operating Instructions Manual page 22

Power factor controllers
Table of Contents

Advertisement

Single-Phase connection
CT Connection
Direct
Inverted
4. Delay time
The programmed delay time value is
displayed (the default value is 40s).
The delay time may be programmed from 1s
to 999s.
It is highly recommended that the switching
delay time is not less than 40 seconds.
5. Output
The programmed output value is displayed.
The output value may be programmed as
follows:
RVC 3: up to 3
RVC 6: up to 6
RVC 8: up to 8
RVC 10: up to 10
RVC 12: up to 12
Connection Drawing
6. Sequence
The programmed sequence type is displayed
according to the following table.
Type of séquence
1:1:1:1:1:...:1
1:2:2:2:2:...:2
1:2:4:4:4:...:4
1:2:4:8:8:...:8
1:1:2:2:2:...:2
1:1:2:4:4:...:4
1:1:2:4:8:...:8
23
Phase to be programmed
0
180
Display
1.1.1
1.2.2
1.2.4
1.2.8
1.1.2
1.1.4
1.1.8

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents