Note: It is very important to read and follow these Safety Precautions before assembly and during the use of this product. PRE-ASSEMBLY PREPARATION: THIS PACKAGE MAY CONTAIN SMALL ITEMS WHICH SHOULD BE KEPT AWAY FROM CHILDREN. • Please check that all parts and hardware are included before beginning assembly. •...
PLANNING ASSEMBLY It will take two people to complete the assembly process. A free-standing ladder and a Philips screwdriver are needed during the assembly. HARDWARE INCLUDED NOTE: Hardware not shown to actual size. Part Description Quantity Part Description Quantity Bolt (M5x10) Guy rope Bolt (M6x16) Anchor...
PACKAGE CONTENTS Part Description Quantity Part Description Quantity Post Vent hub Post base Corner roof tube Corner bracket Long midde roof tube Left short beam Middle roof tube Right short beam Vent cover Left long beam Main canopy Right long beam Netting panel 4/12...
Page 5
STEP-BY-STEP ASSEMBLY: Attaching post bases and corner brackets □ Attach one post base (B) to the bottom of each post (A) with three bolts (AA) using a Philips Screwdriver. □ Attach one corner bracket (C) to the top of each post (A) with three bolts (AA) using a Philips Screwdriver. □...
Page 6
STEP-BY-STEP ASSEMBLY: Assembling beams □ Connect one left long beam (F) into one right long beam (G) and secure them with two bolts (CC) and two nuts (EE) using hex wrench (II) and spanner (JJ). □ Repeat this for the remaining long beams (F,G). □...
Page 7
STEP-BY-STEP ASSEMBLY: Setting up the main frame □ Please have a free standing ladder ready for ease of assembly. □ Use two bolts (DD) to attach the (G) side of the assembled long beams to the outside right corner post (A) and two bolts (DD) to attach the (F) side of the assembled long beams to the outside left corner post (A).
Page 8
STEP-BY-STEP ASSEMBLY: Attaching corner roof tubes □ With a person on the ladder in the center of the main frame, insert one corner roof tube (I) into each recevier (I) of the vent hub (H) until the ball catches and locks. □...
Page 9
STEP-BY-STEP ASSEMBLY: Attaching the roof frame □ Snap one middle roof tube (K) into each receiver (K) of the vent hub (H). Attach (K) to the short cross beam (E) with bolt (BB). □ Snap one middle roof tube (J) into each receiver (J) of the vent hub (H). Attach (J) to the long cross beam (G) with bolt (BB) . □...
Page 10
STEP-BY-STEP ASSEMBLY: Attaching the main canopy and the vent cover □ Identify the long side and the short side of the main canopy (M), cover the roof frame with the main canopy (M). □ Fully extend each corner of the main canopy (M) to cover the four corners of the frame. □...
Page 11
STEP-BY-STEP ASSEMBLY: Hanging the nettings □ Find the short and long side of each netting panel (N). □ Attach the long and short sides of each netting panel to the plastic rings (LL) from the inside corners of the main frame. □...
Page 12
STEP-BY-STEP ASSEMBLY: Anchoring the garden house □ Adjust the location of each post until all posts are standing completely upright on level ground. Hammer two ground stakes (FF) through the holes on each post base (B) into soft ground. □ Measure out from post to the longest possible distance to best use the length of the guy rope (GG) and secure anchor (HH) to ground at 45 degress.
Need help?
Do you have a question about the 5LGZ1295 and is the answer not in the manual?
Questions and answers