Download Print this page

Advertisement

Quick Links

Ready To Go
SimpleSpec 600.01
For more information, please visit 3-form.com or call 800.726.0126
June 2018 | MAn-RTG-600-01 | ReV 002 © 2018 3form, Inc. All rights reserved.
tm
Installation Manual

Advertisement

loading

Summary of Contents for 3form SimpleSpec 600.01

  • Page 1 Ready To Go SimpleSpec 600.01 Installation Manual For more information, please visit 3-form.com or call 800.726.0126 June 2018 | MAn-RTG-600-01 | ReV 002 © 2018 3form, Inc. All rights reserved.
  • Page 2: Contents Overview

    (�1) large (�10) large (�2) Z-Clip Dimmable Power Supply 3-60-756 Required Tools Drill Level Measuring Tape Screws For more information, please visit 3-form.com or call 800.726.0126 June 2018 | MAn-RTG-600-01 | ReV 002 © 2018 3form, Inc. All rights reserved.
  • Page 3 8" 3form provided starter feed Contractor line 14AWG 50' max 31" 100W 24V PS 3" Focal LEDs For more information, please visit 3-form.com or call 800.726.0126 June 2018 | MAn-RTG-600-01 | ReV 002 © 2018 3form, Inc. All rights reserved.
  • Page 4 Contractor line 14AWG 50' max 31" 100W 24V PS 100W 24V PS 3" Focal LEDs For more information, please visit 3-form.com or call 800.726.0126 June 2018 | MAn-RTG-600-01 | ReV 002 © 2018 3form, Inc. All rights reserved.
  • Page 5 Measure and Mark Dimensions 3form 600.01 must be fully supported on the bottom by the millwork supplied by others. It cannot be hung on Z-clips only. Millwork must be built to allow future removal of lightbox for access to lighting.
  • Page 6 Installation Attach Z-Clips Attach z-clips with proper fasteners to the millwork and ensure all z-clips line up with clips on the 3form Lightbox. For more information, please visit 3-form.com or call 800.726.0126 June 2018 | MAn-RTG-600-01 | ReV 002 © 2018 3form, Inc. All rights reserved.
  • Page 7: Drill Holes For Wiring

    Drill a ½" access hole in millwork in the matching preferred location to allow low voltage wiring to run to remote driver location. For more information, please visit 3-form.com or call 800.726.0126 June 2018 | MAn-RTG-600-01 | ReV 002 © 2018 3form, Inc. All rights reserved.
  • Page 8 Remove the lower reflective access panel by removing the screws in order to access the wire and pull it throught the hole drilled in Step 3a. Feed wiring into millwork while hanging the 3form Lightbox onto the z-clips. For more information, please visit 3-form.com or call 800.726.0126 June 2018 | MAn-RTG-600-01 | ReV 002 © 2018 3form, Inc. All rights reserved.
  • Page 9 Installation Hang the 3form Lightbox Make sure the bottom of the 3form Lightbox is resting on the bottom of the millwork. For more information, please visit 3-form.com or call 800.726.0126 June 2018 | MAn-RTG-600-01 | ReV 002 © 2018 3form, Inc. All rights reserved.
  • Page 10: Connect Electrical

    600.01. This will pull the unit tight to the substrate and hold it in place. Blue For more information, please visit 3-form.com or call 800.726.0126 June 2018 | MAn-RTG-600-01 | ReV 002 © 2018 3form, Inc. All rights reserved.