Owner's Manual | Desktop Open Frame 2 Post Rack 10-32 Threaded Frame 2 Post Rack
2. RACK ASSEMBLY
Attach Front Base (A) to the Left Base (D) and Right Base (E) and secure them with
2 of the M6*12mm Screws (G) and 2 of the M6 Flange Nuts (H) using a Phillips Screwdriver
(not included).
Attach Left Vertical Rail (B) and Right Vertical Rail (C) to the frame built above and secure
them with 8 of the M6*12mm Screws (G) and 8 of the M6 Flange Nuts (H) using a Phillips
Screwdriver (not included).
4
Assemble Front Base to Left and Right Base
Assemble Left and Right Vertical Rail
NavePoint.com