Item designation Item number Technical data 10 | P a g e...
Page 11
► Observe the same transport and storage conditions for the sonnenProtect. ► Check the following scope of delivery to ensure it is complete. 11 | P a g e...
Page 12
► Observe the required ambient conditions (see 3.1). ► ► the sonnenProtect can be easily reached and there is sufficient space for installation and maintenance work. ► ► 12 | P a g e...
Page 13
► ► ► ► ► ► ► ► ► Allen screw | 5 mm Spanner | 10 mm ► ► 13 | P a g e...
Page 14
► Tools: • Screwdriver with a thin blade (0.4 mm) Remove the dummy plug shown. A screwdriver with a thin blade can be used for this purpose. 14 | P a g e...
Page 15
Tools: • Spanner (25m) Install the cable gland as shown. ► Wire the connection cable of the sonnenProtect through the cable gland to the inside of the storage system. 15 | P a g e...
Page 16
Tools: Spanner | 10 mm | 5 Nm Stripping pliers ► Strip approx. 1 cm from the end of the black and grey cable. ► Connect the cable and pre-assembled strands as shown in Figure 13. Run the strands through the cable gland (3) to the inside of the inverter (1).
Page 17
► ► Gavazzi LCD Screen ► ► 17 | P a g e...
Page 18
The Gavazzi EM271 metering device supplied with the sonnen eco 8.2 systems has as part of its pre-programming the EC (easy connect) function is activated as standard. The easy connect setting will convert any negative power flow to a positive value Gavazzi LCD Screen ►...
Page 20
► ► 1 Press switch S1 and hold it down while the following steps are carried out. 2 Switch on fuse switch F1. 3 Keep switch S1 held down for at least another 5 seconds. 4 Release switch S1. ► 20 | P a g e...