Assembly/Mounting; Connection - LED2WORK SPOTLED II Operating Instructions Manual

Machine lighting
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 8
4 | Assembly / Mounting
Check the LED luminaire before installation to ensure it is complete and shows no signs of damage. Do not use the
luminaire or accessories if they are damaged, as there is a risk of injury.
The LED luminaire comes fully assembled.The luminaire must be attached via the rear nut, alternatively via the provided
holes. As option there are this mounting accessories:
SPOTLED II articulated joint, V2A, exclusive luminaire
3
See the drawing:
OPTION

5 | Connection

Suitable connection material, cables and accessories can be found in the accessory range of LED2WORK.
PIN assignment of the M12 connector is as follows:
PIN assignment
PIN 1
= 24V DC
PIN 2
= not used
PIN 3
= GND
PIN 4
= 24V DC
PIN 5
= not used
10 | BA SPOTLED II Aufbau . BA 03/2022
From ambient temperatures > 40°C, the luminaire must be directly connected to a metal
surface of approx. 150 x 150 mm. The use of thermal paste is recommended.
When mounting the luminaire, make sure that the luminaire is fastened securely and
stably. If the luminaire falls down, its weight poses a risk of injury!
Schematic drawing of M12 plug
Possible variants of the M12 connector
PIN 3 = 0V DC. 24V DC for supply can be connected to PIN1 or PIN 4. It is not necessary to
assign both PINs (PIN 1 and PIN 4) at once!
The luminaire is not equipped with a ON/OFF switch. Usually you switch the luminaire ON
or OFF via external switches of machines or systems.
Product no.
214300-01

Advertisement

Table of Contents
loading

Table of Contents