Automatic power factor correction relay (23 pages)
Summary of Contents for Trinity NEWTON+
Page 1
Automatic Power Factor Correction Relay NEWTON+ USER MANUAL TRINITY ENERGY SYSTEMS PVT LTD...
Page 2
So same or different phase can be use for voltage and current inputs. For correct operation of relay, however, there are some minimum system requirements to be met. Unless the various points in the system which are mentioned below are correctly setup, proper operation of the relay cannot be expected. Connection Scheme TRINITY...
Page 3
BINARY and Straight FIFO (SFIFO) which are also selectable at site. In case, the CONTROL action is selected to VAR, capacitor CT and AUTOSENSING parameters are applicable at site. However, both the two parameters will not be applicable in case of FIFO, Straight FIFO (SFIFO) and Binary TRINITY...
Page 4
This is one type of digital dead band in case of VAR control action. Time Delay is freely programmable from 1 to 10 in Fast (Thyristor) and from 40 to 180 in Normal (Contactor) switching. 14. ON DELAY In case of FIFO or Straight FIFO (SFIFO) control action, On Delay is freely TRINITY...
Page 5
4 to 5 minutes while the autosense is in progress. This process is vital for the smooth operation of the relay. Once all capacitor banks could be sensed, the relay will restart for control action after a while. TRINITY...
Page 6
If target PF is set on Lag side it will switch OFF banks if PF goes below 0.980 lead. If Target PF set on the lead side, it will switch OFF banks when PF goes below this parameters value. Value of "OFF_SET" parameter can be set to 1.780 to (Target_PF-0.2). TRINITY...
Page 7
Trinity Dealer or Factory. Trinity will, at its option, repair or replace on an exchange basis the defective unit, without charge for parts or labor.
Need help?
Do you have a question about the NEWTON+ and is the answer not in the manual?
Questions and answers