Plumbing - Ozone Generator; Electrical - DEL CMP MCD-250SE-01 Installation Instructions & Product Manual

Mcd spa ozone generator
Table of Contents

Advertisement

SECTION 1 Installation
7. Plumbing – Ozone Generator (refer to Figure 1)
a. Connect the PVC ozone tubing provided to the hose barb on the
Ozone Generator.
b. Slide hose clamps onto the tubing and run the tubing to the
vacuum source.
i. If the Ozone Generator is mounted above the water line, tubing
may be run directly to the vacuum source.
ii. If Ozone Generator is mounted below the water line, run tubing
to a point above the water line and back down to the vacuum
source. Secure tubing in this position.
c. Cut the tubing at the high point in the tubing. Slide hose clamps on
each end and install the check valve in the tubing. Observe the flow
arrow on the check valve and ensure that the flow direction is into
the vacuum source.
d. Secure all tubing connections with the hose clamps.
Spa Controller
Spa Supply
Figure 1: Typical Injection System Arrangement

8. Electrical

a. Test the G.F.C.I. breaker protecting the spa for proper operation.
b. Disconnect power to the spa.
c. Connect the Ozone Generator cord to the mating connector(s) on
the spa controller as described in the Spa's Installation Manual.
d. Where possible, route the power cord away from other electrical
lines. Do not run the power cord parallel to any low voltage signal
wires.
e. Secure the power cord as required to prevent damage.
Ozone Generator
Pump
2
Ozone
Flow
Spa Return
Injector
Check Valve

Advertisement

Table of Contents
loading

Related Products for DEL CMP MCD-250SE-01

Table of Contents