Advertisement

Quick Links

TABLE OF CONTENTS
Receiving Instructions
After delivery, remove the packaging from the product. Inspect the product closely to
determine whether it sustained damage during transport. If damage is discovered, record a
complete description of it on the bill of lading. If the product is undamaged, discard the
packaging.
NOTE: The end-user is solely responsible for confirming that product design, use, and
maintenance comply with laws, regulations, codes, and mandatory standards applied where
the product is used.
Technical Service & Replacement Parts
For answers to questions not addressed in these instructions and to order replacement parts,
labels, and accessories, call our Technical Service and Parts Department at (260) 665-7586. The
Department can also be contacted online at https://www.vestil.com/page-parts-request.php.
Electronic Copies of Instruction Manuals
Additional
copies
https://www.vestil.com/page-manuals.php.
Signal
Words...................................................................................................................
Safety
Instructions............................................................................................................
Specifications...............................................................................................................
Exploded View and Bill of
Assembling the
Steps..................................................................................................... 5, 6,
Using the
Steps..............................................................................................................
Record of Satisfactory
Inspections &
Maintenance.............................................................................................
Labeling
Diagram................................................................................................................
Limited
Warranty............................................................................................................
TABLE OF CONTENTS
2999 North Wayne Street, P.O. Box 507, Angola, IN 46703
Telephone: (260) 665-7586 -or- Toll Free (800) 348-0868
Web:
VST-4-Y
of
this
instruction
Table of Contents
Materials..................................................................................
Condition......................................................................................
Copyright 2021 Vestil Manufacturing Corp.
Rev. 3/7/2022
Vestil Manufacturing Corp.
Fax: (260) 665-1339
www.vestilmfg.com
manual
may
VST-4-Y, MANUAL
e-mail:
info@vestil.com
be
downloaded
Page 1 of 10
from
Page
2
2
-
3
3
4
7
7
8
8
9
10

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VST-4-Y and is the answer not in the manual?

Questions and answers

Summary of Contents for Vestil VST-4-Y

  • Page 1 For answers to questions not addressed in these instructions and to order replacement parts, labels, and accessories, call our Technical Service and Parts Department at (260) 665-7586. The Department can also be contacted online at https://www.vestil.com/page-parts-request.php. Electronic Copies of Instruction Manuals...
  • Page 2: Signal Words

    SAFETY INSTRUCTIONS Vestil strives to identify hazards associated with the use of its products, but no manual can address every conceivable risk. Minimize the likelihood of injury by recognizing the hazards identified below and by inspecting and maintaining the product as instructed in INSPECTIONS &...
  • Page 3: Specifications

    (p. 10) and might make the steps unsafe to use. SPECIFICATIONS Documents that provide specifications for VST series products are available online to anyone who visits Vestil’s website. Specifications include dimensions, net weight, and capacity information. To access appropriate specifications document,...
  • Page 4: Exploded View And Bill Of Materials

    NUT, EXPANDING INSERT, 4 WING, FLAT WASHER,ZINC PLATED,USS, 99-145-196 33006 1/4-20, .1875-.375 GRIP Ø5/16" Ø 1/4-20 UNC x 1 1/4 LG HEX BOLT, 14-524-018 WELDMENT, HANDRAIL POST 11007 GRADE A TABLE OF CONTENTS Copyright 2021 Vestil Manufacturing Corp. Page 4 of 10...
  • Page 5 See diagram following step 2c on the next page. b. Put 3/8”-16 lock nuts (37024) in the fastener recesses of the pipe ends connected to the handrail tubes. TABLE OF CONTENTS Copyright 2021 Vestil Manufacturing Corp. Page 5 of 10...
  • Page 6 Install 5/16”-18 acorn nuts (37709) onto both legs of both U-bolts. Tighten each acorn nut to 8.8ft∙lb. Handrail stabilizer bar (14-017-041) U-bolt Acorn Lock Stabilizer Hex nut U-bolt Lock Acorn TABLE OF CONTENTS Copyright 2021 Vestil Manufacturing Corp. Page 6 of 10...
  • Page 7 Move the steps by grasping the handrail posts at the top of the steps. Pull the handrails towards you to tip the steps onto the casters. Push the steps to the desired location. TABLE OF CONTENTS Copyright 2021 Vestil Manufacturing Corp. Page 7 of 10...
  • Page 8: Inspections And Maintenance

    3 steps. The top step should have 4 strips of tape. Make sure that anti-slip, abrasive material is present along the entire length and width of each strip of tape. Tape strips should not be peeling off of the steps. TABLE OF CONTENTS Copyright 2021 Vestil Manufacturing Corp. Page 8 of 10...
  • Page 9: Labeling Diagram

    (260) 665-7586 and asking the operator to connect you to the TECHNICAL SERVICE & PARTS DEPARTMENT. Information molded into steps material C: Label 731 A: Label 1153 B: Label 740 TABLE OF CONTENTS Copyright 2021 Vestil Manufacturing Corp. Page 9 of 10...
  • Page 10 Before providing warranty service, Vestil will require you to send the entire product, or just the defective part (or parts), to its facility in Angola, IN. What is covered under the warranty? The warranty covers defects in the following original, dynamic parts: motors, hydraulic pumps, motor controllers, and cylinders.

Table of Contents