Field Fabricate Ductwork; Provide Clearances; Rig And Place Unit - Carrier 48EZ(N)-A Installation Instructions Manual

Comfort 13 seer single-packaged hybrid heat dual fuel system with puron (r-410a) refrigerant single and three phase 2-5 nominal tons (sizes 24-60)
Hide thumbs Also See for 48EZ(N)-A:
Table of Contents

Advertisement

CAUTION - NOTICE TO RIGGERS
PRUDENCE - AVIS AUX MANIPULATEUR
PANNEAUX D'ACCES DOIT ÊTRE EN PLACE POUR MANIPULATION.
Use top skid as spreader bar. / Utiliser la palette du haut comme barre de répartition
SEE DETAIL A
VOIR DÉTAIL A
RIGGING WEIGHTS (SMALL CABINET)
24
Unit
lb
kg
lb
Rigging
359
163
373
Weight
NOTE: See dimensional drawing for corner weights.
Step 3 — Field Fabricate Ductwork
Secure all ducts to roof curb and building structure on vertical
discharge units. Do not connect ductwork to unit. For horizontal
applications, unit is provided with flanges on the horizontal
openings. All ductwork should be secured to the flanges. Insulate
and weatherproof all external ductwork, joints, and roof openings
with counter flashing and mastic in accordance with applicable
codes.
If a plenum return is used on a vertical unit, the return should be
ducted through the roof deck to comply with applicable fire codes.
See unit rating plate for any required clearances around ductwork.
Cabinet return- -air static shall not exceed - -.25 IN. W.C.
Step 4 — Provide Clearances
The required minimum operating and service clearances are shown
in Fig. 2 and 3.
IMPORTANT: Do not restrict outdoor airflow. An air restriction
at either the outdoor- -air inlet or the fan discharge may be
detrimental to compressor life.
The condenser fan pulls air through the condenser coil and
discharges it through the top grille. Be sure that the fan discharge
does not recirculate to the condenser coil. Do not locate the unit in
either a corner or under an overhead obstruction. The minimum
clearance under a partial overhang (such as a normal house
overhang) is 48- -in. (1219 mm) above the unit top. The maximum
horizontal extension of a partial overhang must not exceed 48- -in.
(1219 mm).
Do not place the unit where water, ice, or snow from an overhang
or roof will damage or flood the unit. Do not install the unit on
carpeting or other combustible materials. The unit may be installed
on Class A, B, or C roof covering materials. Slab mounted units
should be at least 4- -in. (102 mm) above the highest expected water
and runoff levels. Do not use unit if it has been under water.
ACCESS PANELS MUST BE IN PLACE WHEN RIGGING.
MINIMUM HEIGHT: 36" (914.4 mm)
HAUTEUR MINIMUM
UNIT HEIGHT
HAUTEUR D'UNITÉ
30
36
Unit
kg
lb
kg
Rigging
169
379
172
Weight
Fig. 5 - - 48EZ- -A Suggested Rigging
DUCTS
SEAL STRIP MUST BE IN
PLACE BEFORE PLACING
UNIT ON ROOF CURB
DETAIL A
VOIR DÉTAIL A
RIGGING WEIGHTS (LARGE CABINET)
42
lb
kg
lb
461
209
482
Step 5 — Rig and Place Unit
WARNING
!
PERSONAL INJURY OR PROPERTY DAMAGE
HAZARD
Failure to follow this warning could result in personal
injury, death or property damage.
When installing the unit on a rooftop, be sure the roof will
support the additional weight.
Rigging and handling of this equipment can be hazardous for
many reasons due to the installation location (roofs, elevated
structures, etc.).
Only trained, qualified crane operators and ground support staff
should handle and install this equipment.
When working with this equipment, observe precautions in the
literature, on tags, stickers, and labels attached to the equipment,
and any other safety precautions that might apply.
Training for operators of the lifting equipment should include, but
not be limited to, the following:
1. Application of the lifter to the load, and adjustment of the
lifts to adapt to various sizes or kinds of loads.
2. Instruction in any special operation or precaution.
3. Condition of the load as it relates to operation of the lifting
kit, such as balance, temperature, etc.
Follow all applicable safety codes. Wear safety shoes and work
gloves.
Inspection
Prior to initial use, and at monthly intervals, all rigging shackles,
clevis pins,
and straps should be visually inspected for any
damage, evidence of wear, structural deformation, or cracks.
Particular attention should be paid to excessive wear at hoist
6
BANDE SCELLANT DOIT ÊTRE
EN PLACE AVANT DE PLACER
L'UNITÉ SUR LA BASE DE TOIT
50CY502286 2.0
A09051
48
60
kg
lb
kg
219
507
230

Advertisement

Table of Contents
loading

This manual is also suitable for:

48ez-a

Table of Contents