Tripp Lite N48M Series Installation Manual page 3

Ultra high-density fiber panel all-in-one solution
Hide thumbs Also See for N48M Series:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Installation
3
Place the panel into position in an enclosure
or open frame rack. Align the mounting holes
and use rack-mounting screws (2 per side, not
included) to secure the unit.
3
5
Locate the appropriate MPO cable. Remove the Velcro strap, uncoil and pull cable, as required. Excess cable slack can be
recoiled inside the panel.
Cables are
labeled per port
in both meters
and feet.
5
21-05-082-933F25.indb 3
21-05-082-933F25.indb 3
4
To access the MPO cables, untighten the two handscrews
located on the rear of the unit
and flip down the rear access plate
4
Available rear-to-front
cable access.
3
, lift the top panel
A
.
C
B
A
B
C
10/22/2021 1:31:47 PM
10/22/2021 1:31:47 PM

Advertisement

Table of Contents
loading

Table of Contents