Installation record........................2 Important information......................3 Operating conditions and requirements...................3 Preparation of the system for installation.................4 Installation...........................5-6 Commissioning........................7-8 Electronic control panel....................9-13 Maintenance........................14-15 For future reference, fill in the following data INSTALLATION RECORD Serial number:................... Model:....................Iron (Fe) content-inlet................ Manganese (Mn) content-inlet:............Hydrogen sulphide (H S) content-inlet :..........
Electronic Equipment requirements. Refer to national, local laws and codes for correct recycling of the appliance. OPERATING CONDITIONS AND REQUIREMENTS Limits of application: Parameter OXYLINE OXYLINE PLUS pH to remove iron 6,8 - 9,0 5,8 – 10,0 pH to remove manganese 8,0 - 9,0 5,8 –...
OPERATING CONDITIONS AND REQUIREMENTS OPERATING TEMPERATURE MIN-MAX: 2-43 °C / 39-109 °F - do not install the appliance in an environment where high ambient temperatures (e.g. unvented boiler house) or freezing temperatures can occur. - the appliance cannot be exposed to outdoor elements, such as direct sunlight or atmospheric precipitation. - do not install the appliance too close to a water heater;...
INSTALLATION 1. mains water supply (untreated water). INLET & OUTLET 2. inlet of appliance (untreated water). 3. outlet of appliance (treated water). - In case of high concentration of impurities in the inlet 4. house/application (treated water). water, we recommend the installation of a sediment filter, ahead of the appliance.
Page 6
INSTALLATION WITH 3-VALVE BYPASS SYSTEM DRAIN (not included). - We recommend the use of a stand pipe with air trap. - To prevent backflow from the drainage system into the appliance, always make sure to have an air gap between the end of the drain line and the drainage system itself;...
COMMISSIONING Step 3: Draw the transformer cord through the slot in the ELECTRICAL CONNECTION housing. PREPARATION OF THE HEAD FOR PROGRAMMING.. NOTE! YOU MUST BE PARTICULARLY CAREFUL NOT TO BREAK THE FASTENINGS AND NOT TO DAMAGE THE Before programming the head, in the first place you DISPLAY.
Page 8
COMMISSIONING STEP 3. Open the mains water supply. Step 5. Plug in the element on which the controller is installed. Push the element gently until you can hear a STEP 4. Open a cold treated water faucet nearby the characteristic „click”. appliance and let the water run for a few minutes until all air is purged and all foreign material that may have NOTE! YOU MUST BE PARTICULARLY CAREFUL NOT TO...
ELECTRONIC CONTROL PANEL Step 4: SETTING THE PROPER DAY OF THE WEEK: Set the SETTING THE TIME AND DAY OF THE WEEK day of the week by pressing the buttons „+” or „-”. Pressing the button „NEXT” causes going to the next parameter. Setting the time should take place only in case when the You can go back to the previous step anytime by pressing appliance is connected to the power supply (the first start-...
Page 10
ELECTRONIC CONTROL PANEL Step 2: SETTING THE LANGUAGE - the display shows that it Step 4: Setting the regeneration time (HOUR) - As standard operates in English version „ENGLISH”. With the buttons the producer set the regeneration at 2:00. At that time the „+”...
Page 11
ELECTRONIC CONTROL PANEL Press the button „NEXT” to go to the next parameter. Press Step 7: Setting the type of messages. the button „REGEN”, if you want to go back to the previous The alarm of messages operates in two modes: parameter.
Page 12
ELECTRONIC CONTROL PANEL START-UP: SETTING THE TIME (MINUTES): Set proper GENERAL INFORMATION figure of „minutes” by pressing the buttons „+” or „-”. Pressing the button „NEXT” causes going to the next parameter. You can go back to the previous step anytime, During the operation, the controller may show one of the by pressing the button „REGEN”.
ELECTRONIC CONTROL PANEL POSTPONED MODE: To initiate the regeneration manually If the regeneration is initiated on a given day, the and define its time, you should press and release the message „REGENERATION TODAY” appears on the button „REGEN”. „REGENERATION TODAY" appears on the screen.
Page 14
MAINTENANCE WITH 3-VALVE BYPASS SYSTEM (not included). BYPASS POSITION [2] 1. inlet valve to appliance is CLOSED. 2. outlet valve from appliance is CLOSED. SERVICE POSITION [1] 1. bypass valve is CLOSED. 2. inlet valve to appliance is OPEN. 3. outlet valve from appliance is OPEN. MAINTENANCE POSITION [3] 1.
Page 15
MAINTENANCE POWER LOSS AND BATTERY REPLACEMENT APPEARANCE The AC transformer comes with a 15 foot power cord and To retain the appearance of the appliance, simply wipe is designed for use with the control valve; the transformer it with a damp cloth or clean it with a mild soap solution; should only be used in a dry location.
Need help?
Do you have a question about the OXYLINE and is the answer not in the manual?