Comfort and performance 13 and 14 seer single packaged air conditioner and gas furnace system with puron (r-410a) refrigerant single and three phase 2 - 5 nominal tons (sizes 24 - 60) (11 pages)
48ez(n)-a series comfort 13 seer single packaged hybrid heat dual fuel system with puron r (r-410a) refrigerant single and three phase 2-5 nominal tons (sizes 24-60) (38 pages)
Comfor and performance 13 and 14 seer single packaged air conditioner and gas furnace system with puron (r-410a) refrigerant single and three phase 2-5 nominal tons (sizes 24-60) (8 pages)
Nominal 3 to 12.5 tons
with puron (r410a) refrigerant (131 pages)
Summary of Contents for Carrier 48ES
Page 1
UNIT INFORMATION Model # Serial # ACCESSORIES (List type and model #) This manual must be left with the equipment Fig. 1 - Unit 48ES NOTE TO EQUIPMENT OWNER: data and dealer contact information, or service. INSTALLATION INFORMATION Date Installed...
Page 2
SAFETY CONSIDERATIONS Improper installation, adjustment, alteration, service maintenance, or use cause explosion, fire, electrical conditions which may cause death, personal damage. Consult a qualified installer, service distributor or branch for information or assistance. installer or agency must use factory-authorized when modifying this product.
()NIT INTRODUCTION This 4 8ES u nit i sasmall packaged gas h eat/electric that can utilize t he comfort ofgas h eating packaged cient electric airconditioning. This unituses Puron ®, t he ozone friendly refrigerant forcooling. Starting orShutting OffUnit Note:Your combination heating/cooling unit i sequipped...
OPERATING YOUR UNIT The operation ofyour u nit i scontrolled control (thermostat). You simply adjust the thermostat tains the indoor temperature at the level you select. Most thermostats of heating and cooling systems have 3 controls: trol selector, a FAN control, and a SYSTEM fer to your thermostat owner's...
Page 5
Fans and Fan Motors Periodically check the condition of fan wheels and housings motor shaft bearings. Contact your dealer for the required maintenance. Heat ExchanRer To ensure dependable and efficient heating changer should be checked by a qualified maintenance fore each heating season, and cleaned when necessary.
Page 6
MAIN STEP1 STEP2 STEP3 STEP 5 STEP 4 STEP 6 STEP 7 MAIN STEP8 STEP 9 STEP10 A07662 Fig. 4 - To Start Unit Gas Heat...
Page 7
MAIN STEP1 STEP2 STEP3 STEP 4 STEP 5 STEP 6 A07663 Fig. 5 - To Shut-off Unit Gas Heat...
Page 8
STEP1 STEP 4 STEP 6 Fig. 6 - To Start Unit Electric MAIN STEP2 STEP 5 MAIN STEP 7 STEP8 Cooling STEP3 °il A07796...
STEP1 BURNER FLAME Fig. 8 - Monoport Burner 6. Inspection and cleaning of blower wheel housing 7. Inspection of all supply-air and return-air obstructions, and insulation integrity. should be resolved at this time. 8. Inspection of the unit base to ensure that no cracks, gaps, etc., exist which may cause a hazardous condition.
Page 10
Have available the Model No., Series Letter, & Serial No. of your equipment to ensure correct replacement part. Copyright 2008 Carrier Corporation Printed in the U.S.A. Edition Date: 11/08 Catalo_ No: OM48ES-01 Manufacturer reserves the right to change, at any time, specifications...