GENERAL INFORMATION The Indicate™ system is automatic and has easy-to-interpret LED indicators to assure drivers and technicians of proper system function by monitoring the source power and liftgate batteries. Simply put, the Indicate system provides indication that the current charging system for the liftgate batteries is functioning properly, which is essential in low mileage, high frequency liftgate operation applications.
INDICATE CONTROLLER MOUNTING Step 1: Mount the Indicate controller at the front of the trailer via the mounting holes on the plate that the controller is mounted to. INDICATE SINGLE POLE APPLICATION Step 1: Route the jacketed 2-conductor input harness up to the single pole receptacle.
Page 7
IMPORTANT: The chassis ground wire must be attached to a good chassis ground. P: 479.419.4800 | F: 479.419.4801 | www.purkeys.net...
Step 6: Mount the single pole nosebox back onto the front of the trailer. Attach the chassis ground wire to the front of the trailer using the supplied self-tapping screws. INDICATE DUAL POLE APPLICATION Step 1: Route the jacketed 2-conductor input harness up to the dual pole receptacle.
Page 9
2 amp fuse holder. Solder and apply the supplied 2 pieces of ¼” red heat shrink. Connect the black ground wire to the negative side of the dual pole receptacle and tighten. P: 479.419.4800 | F: 479.419.4801 | www.purkeys.net...
Step 6: Mount the dual pole nosebox back onto the front of the trailer. INDICATE LIFTGATE BATTERY HARNESS Step 1: Route the jacketed 2-conductor liftgate battery harness behind the front plate then behind the header plate through the air/electrical tube to the center channel.
Page 11
Step 5: Pull the jacketed 2-conductor back out of the box (easier to work on) and cut of the excess at your mark. P: 479.419.4800 | F: 479.419.4801 | www.purkeys.net...
Page 12
Step 6: Cut about 8 inches off of the conductor. Step 7: Apply the supplied 3/8 inch black heat shrink where the jacket was stripped off. Step 8: Strip 3/8 inch of insulation off both red and black wires.
Page 13
2 amp fuse holder to the red wire. Solder and heat shrink both connections. Step 10: Attached the 2 amp fuse holder to liftgate battery positive and the black ground wire to the liftgate battery negative. Installation complete. P: 479.419.4800 | F: 479.419.4801 | www.purkeys.net...
Product or failure of a part not manufactured by Purkeys. This warranty shall not apply if any Purkeys product is used for a purpose for which it is not designed or is in any way altered without the specific prior written consent of Purkeys. ANY...
Need help?
Do you have a question about the INDICATE-01 and is the answer not in the manual?
Questions and answers