Fill With Sand; Assemble Multi-Port Valve; Install Multi-Port Valve - Polaris PRESTIGE PAG19SF Owner's Manual

Above ground sand filter
Hide thumbs Also See for PRESTIGE PAG19SF:
Table of Contents

Advertisement

Available languages

Available languages

Page 6
ENGLISH
Align tabs on lateral to slots in hub.

4.3 Fill With Sand

The proper type, amount and cleanliness of your filter
sand is critical to the proper function and longevity of
your equipment.
#20 Silica Sand (for pool filter use only)
Size Range .40 - .55 mm
Model
Lbs. (kg)
PAG19SF
150lbs (68kg)
PAG22SF
250lbs (113kg)
1. Make sure the filter is level on the equipment pad.
NOTE: Move the breather tube inside the tank on
top of the sand surface.
2. Prepare filter for sand.
Fill the filter 1/3 - 1/2 full of water before
a
adding sand.
• This will minimize any undue strain on the
laterals when adding sand.
Ensure stand pipe is seated at the bottom of
b
the filter tank.
Install the sand guard.
c
• The sand guard should completely cover the
pipe opening.
• Special care should be taken to avoid getting
filter sand into the stand pipe.
Using a small scoop, slowly and evenly add
d
sand to the filter.
• Be sure to allow the sand guard to fully drain
between each scoop to avoid spilling.
CAUTION
The Sand Guard must be used at
any time filter media is being
added to the filter. Failure to use
the Sand Guard may result in filter
media intrusion into the pool
and/or malfunction, damage or
failure of the filter components.
Sand Guard
c
Stand Pipe
Water Level
a
Laterals
Assembly
b
Secure with 1/4 turn.
NOTE: Alternate Filter Media
Manufacturers directions must be
followed for any alternate media. Use
of other media may deliver unexpected
results and may void the warranty.
Scoop
d
NOTE: Be sure to use
pool filter sand only.
POOL FILTER SAND
#20 Silica
Size Range .40-.55 mm
Polaris
Prestige Above Ground Sand Filter
®
When all filter sand has been added:
3. Remove sand guard and store for future use.

4.4 Assemble Multi-port Valve

1. Install pressure gauge.
Remove the plug from the pressure gauge port.
a
Install pressure gauge.
b
• Screw into place until snug. DO NOT
OVERTIGHTEN.
• If possible, orient the gauge so that it is
horizontally aligned. The included Teflon
can be used to aid in getting the appropriate
orientation and fit.
If possible, orient the gauge so that it is right
c
reading and perpendicular to ground level.
• Apply 4-6 wraps of PTFE (plumbers) tape for
each union adapter installed at the multi-port
valve. Only install PTFE (plumbers) tape on the
adapter threads at the valve ports.
• Do not use PTFE (plumbers) tape on union nut
threads.
b
a

4.5 Install Multi-port Valve

1. Flip the valve assembly upside down. Install the
valve/tank O-ring so that it is seated below the
valve body flange.
2. Seat valve onto filter tank with standpipe secured
in center port of the multi-port valve body.
3. Make sure pump and return ports are oriented
so that bends and/or joints in plumbing are
minimized.
4. Position the valve clamp so that it captures both
the valve body flange and the filter tank.
|
Owner's Manual
tape
®
Pressure Gauge
c
Ground Level

Advertisement

Table of Contents
loading

This manual is also suitable for:

Prestige pag22sf

Table of Contents