All four of the casters should always be use appropriate protection to avoid locked unless you are moving the oven. damage. Ensure you’re using a Gozney supplied gas connector or one that complies Never attempt to move the oven when it with the Standard for movable gas appliances (ANSI Z21.69 / CSA 6.16),...
Page 4
This section details the process of building the stand and the correct installation of Dome Stand.
Build Manual What’s In The Box 4ft 33/4” 1334mm 5ft 41/2” 1665mm 4ft 1/4” 1227mm 3ft 23/4” 997mm 2ft 51/2” 2ft 83/4” 775mm 880mm BUILD AREA SCALE 1:1 Build the stand in front of the area you F001 F002 F003 F004 F005 F006...
Page 6
Step 1 Step 2 F008 F001 FIXINGS We recommend not fully tightening the bolts until the frame has been assembled. This will ease the alignment of future fixings. Fully tighten at Step 9.
Page 12
Step 13 Step 14 F006 INSTALLING DOME Ensure fixing F006 is in place on the stand before installing the oven. Remove anything loose from the oven before moving. Two people should pick up Dome from the rounded ends of the oven as shown. Don’t use the mouth of the oven as lifting point.
Need help?
Do you have a question about the Dome Stand and is the answer not in the manual?
Questions and answers