  • Page 1 Technical Manual...
  • Page 2 This section details the process of building the stand and the correct installation of Dome Stand.
  • Page 3: Cautions And Warnings

    All four of the casters should always be use appropriate protection to avoid locked unless you are moving the oven. damage. Ensure you’re using a Gozney supplied gas connector or one that complies Never attempt to move the oven when it with the Standard for movable gas appliances (ANSI Z21.69 / CSA 6.16),...
  • Page 4 This section details the process of building the stand and the correct installation of Dome Stand.
  • Page 5: What's In The Box

    Build Manual What’s In The Box 4ft 33/4” 1334mm 5ft 41/2” 1665mm 4ft 1/4” 1227mm 3ft 23/4” 997mm 2ft 51/2” 2ft 83/4” 775mm 880mm BUILD AREA SCALE 1:1 Build the stand in front of the area you F001 F002 F003 F004 F005 F006...
  • Page 6 Step 1 Step 2 F008 F001 FIXINGS We recommend not fully tightening the bolts until the frame has been assembled. This will ease the alignment of future fixings. Fully tighten at Step 9.
  • Page 7 Step 3 Step 4 F008 F001 F008 F001...
  • Page 8 Step 5 Step 6 F008 F001 F008 F002...
  • Page 9 Step 7 Step 8 F008 F002 F008 F002...
  • Page 10: Tighten Bolts

    Step 9 Step 10 F009 F005 TIGHTEN BOLTS Tighten all fixings on the stand, being careful not to over tighten.
  • Page 11 Step 11 Step 12 F010 F007 F004...
  • Page 12 Step 13 Step 14 F006 INSTALLING DOME Ensure fixing F006 is in place on the stand before installing the oven. Remove anything loose from the oven before moving. Two people should pick up Dome from the rounded ends of the oven as shown. Don’t use the mouth of the oven as lifting point.
  • Page 13 Step 15 F003...