INSTRUCTION BULLETIN
NOTE: DO NOT DISCARD the Parts List from the Instruction Bulletin. Place the
Parts List in the appropriate place in the machine manual for future
reference. Retaining the Parts List will make it easier to reorder
individual parts and will save the cost of ordering an entire kit.
Installation instructions for kit number AT20045 / AT20046 - Use same procedure for assembling both kits
1. Connect either the elbow fitting or straight fitting to
the Portable Dispensing Unit (PDU) per application
needs.
2. Connect the hose to the barbed fitting installed on
the PDU in the previous step.
3. Trim the hose to the desired length.
IB DM20100 (05- 2015)

PROTECT THE ENVIRONMENT

Please dispose of packaging materials, used machine components
such as batteries and fluids in an environmentally safe way according
to local waste disposal regulations.
Always remember to recycle.
4. Connect the opposite end of the hose connected to
the PDU to the cap.
5. Connect the cap to the filled transport container.
No. DM20100
Machine: os3
Published: 05- 2015
Rev. 00
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the DM20100 and is the answer not in the manual?

Questions and answers

Summary of Contents for Tennant DM20100

  • Page 1 PDU to the cap. needs. 5. Connect the cap to the filled transport container. 2. Connect the hose to the barbed fitting installed on the PDU in the previous step. 3. Trim the hose to the desired length. IB DM20100 (05- 2015)
  • Page 2 Transport Container: Transport Container: Multisurface Concentrate Multimicro Concentrate AT20046 AT20045 Note: Order Connection Kit AS20035 (MM) / Connection Kit AS20036 (MSC) to connect to os3 filler transport containers TENNANT COMPANY P. O. Box 1452 Minneapolis, MN 55440-1452 IB DM20100 (05- 2015)

Table of Contents