Page 2
2 of 53 Foreword Thank you for purchasing a Siemens Energy SpecTRON 10 Mk. II or 10+ product. The information that follows is an overview of the protection, storage, shipment, unpacking, deployment and maintenance instructions for SpecTRON 10 Mk II and 10+ products.
Page 3
Section 7.1: Clarified that connector mounting screws must be tightened to a dead stop before being torqued. Section 9.1: added info on max unsupported length of harnesses in water. General: Updated to Siemens Energy branding and product safety focused template, content migrated across. C. Plant N.Williamson...
PRODUCT SCOPE This manual includes information on the following SpecTRON 10 and 10+ connector types: SpecTRON 10 Mk. II and 10+ Jumpers, with both Right Angle and Inline Glands SpecTRON 10 Mk. II and 10+ Wet Mate Plug SpecTRON 10 Mk. II and 10+ Permeguard™ Wet Mate Receptacle Connector SpecTRON 10 Mk.
Document No: DOC0074 Issue Date: 22/10/2021 Revision: Page: 8 of 53 Product advice label The following product advice label is supplied with all Siemens Energy subsea connector products. Figure 1 - Product Advice Label Unrestricted...
Figure 2 - Example Etching for SpecTRON 10 Mk. II and 10+ Products Siemens Energy SpecTRON 10 Mk. II and 10+ connectors and penetrators are laser marked on the gland body with the Siemens Energy part number, unique serial number, and product rating information. Additionally, connector front-ends are also marked with their part number and unique serial number to aid traceability during manufacturing.
Revision: Page: 10 of 53 PRODUCT SAFETY Siemens Energy Subsea recommends the termination of all equipment shall only be undertaken by trained, suitably qualified and experienced personnel (SQEP) i.e. competent person. Action-related warnings Classification of action-related warnings The action related warnings are classified in accordance with the severity of the possible danger using the...
Document No: DOC0074 Issue Date: 22/10/2021 Revision: Page: 11 of 53 General safety information 2.3.1 Installation by competent persons only The installation, inspection, maintenance and repair of the product shall be undertaken by trained, suitably qualified and experienced personnel (SQEP) i.e. competent person, to carry out a specifie d activity. Installation, inspection, maintenance and repair of products by untrained and deemed non -competent persons could invalidate the product warranty.
Page 12
Danger! Risk of imminent danger to life, risk of severe personal injury caused by released pressure and or projectile due to incorrectly installed pressure retaining product, e.g. during system pressure test (e.g. SpecTRON 10 or 10+ penetrator fitted with wrong/insufficient screws or seals). Unrestricted...
Page 13
Ensure all product SIT activities are completed by competent persons in accordance with relevant procedures. All pressure testing of SpecTRON 10 Mk. II and 10+ products must be undertaken by a competent person. Installation of SpecTRON 10 Mk. II and 10+ penetrators must be undertaken by a competent person.
Document No: DOC0074 Issue Date: 22/10/2021 Revision: Page: 14 of 53 Warning. Risk of musculoskeletal injury from hand-mating connectors with high mate/de-mate force and/or connector rapidly fires out during de-mate due to high shuttle spring force, e.g. factory/topside testing. Ensure all product testing activities are completed by competent persons in accordance with relevant procedures.
Page 15
Document No: DOC0074 Issue Date: 22/10/2021 Revision: Page: 15 of 53 It is the operator’s and installers responsibility to comply with current Company, area, regional, national and international health and safety legislation. Following installation, commissioning and deployment of product, please complete and return the Customer Comments/Feedback form (Section 9).
Document No: DOC0074 Issue Date: 22/10/2021 Revision: Page: 16 of 53 ABBREVIATIONS Ampere Alternating Current Assy Assembly American Petroleum Institute American Wire Gauge Bill of Material °C Degree Celsius Community European Comms Communication Signal COSHH Control of substances hazardous to health Cathodic Protection Direct Current Drawing...
Page 17
Document No: DOC0074 Issue Date: 22/10/2021 Revision: Page: 17 of 53 Site Installation Test Site Received Test Stainless Steel To Be Defined Twisted Screened Pair Unified Numbering System for Metals and Alloys Volt Unrestricted...
18 of 53 SPECIFICATION AND RESIDUAL HAZARDS The following is the typical specification for SpecTRON 10 Mk. II and 10+ connectors with 150 mm², 6/10(12) kV jumper cable and will differ for connectors terminated to umbilical power cores or internal pigtails, and in other situations.
Weight in water kg/m Max Length without coupler Hose Coupler Weight in air 11.4 11.4 Hose Coupler Weight in water Table 5 - SpecTRON 10 Mk. II and 10+ Hose Specifications Cable Specifications 70 mm² 150 mm Unit Outside Diameter 28,5...
Page 20
Document No: DOC0074 Issue Date: 22/10/2021 Revision: Page: 20 of 53 For all other specifications not included in the above tables, refer to product/project specific data sheet(s), alternatively contact Technical Support connectortechnicalsupport.gb@Siemens-energy.com. Unrestricted...
Hazardous substances, Control of substances hazardous to health (COSHH) Assessments regards to materials such as elastomers and oils, etc. used in SpecTRON 10+ and 10 Mk. II products are available on request from the Product Safety Officer at subsea.connectors.productsafety.gb@siemens-energy.com.
Figure 4 - SpecTRON 10 harness in packaging Figure 4 shows how a SpecTRON 10+ or 10 Mk II harness is packaged. The connectors on either end of the harness have a transportation cap fitted and are surrounded in bubble wrap. The base of the shipping crate is lined with protective packaging and the harness is positioned so that the hose can be coiled without kinking.
Document No: DOC0074 Issue Date: 22/10/2021 Revision: Page: 23 of 53 Figure 5 - Reinforced Bundled Harness Box Figure 5 and Figure 6 show the packing of a bundled harness, the ends are placed in the middle of the crate with all protective caps fitted and the transportation plate for both ends.
All connectors come supplied with a protective cap. Protective caps (typically black in colour) are typically attached to the products as shown in the images below, with the caps indicated with a red arrow. Figure 7 - SpecTRON 10 and 10+ Protective Caps The protective transport caps are attached to the connector as detailed below: •...
Document No: DOC0074 Issue Date: 22/10/2021 Revision: Page: 25 of 53 Safe disposal of packaging Dispose of the packaging correctly, observing and complying with area, regional, national and international environmental legislation. Where possible recycle responsibly. To return waste packaging to the manufacturer, contact the Product Safety Officer at subsea.connectors.productsafety.gb@siemens-energy.com.
SpecTRON 10 Mk. II and 10+ connectors with glands typically weigh more than 30 kg and hence should not be manually handled. The connector can be safely slung around the gland body (see Figure 8 and Figure 9) at a position where the connector is evenly balanced using a noose lifting arrangement.
The SpecTRON 10 Mk II and 10+ connectors can be installed onto client subsea structures by the end user provided the guidance in this document is followed. It is important to ensure that the handling guidelines are followed during all parts of the installation process.
5.5.1 Connector Mounts The mount orientation for SpecTRON 10 and 10+ connectors is defined by the mount type of the connector. The fixed mount Inline and Right Angled connectors, Dummy Plugs and Parking Receptacles can be installed in any orientation.
Orientation of Receptacle connectors can be modified after assembly, so the mount is able to rotate freely for alignment. This is done by removing the location key and tightening the locking ring to a torque specified by Siemens Energy to secure the flange. Unrestricted...
When installing connectors without a location key into their interface, the locking ring that holds the mount interface in place must be checked for Loctite. If it is not present Siemens Energy Connectors recommend that the locking ring is secured with a thread-locking compound, e.g. Loctite 2400.
Page 31
Document No: DOC0074 Issue Date: 22/10/2021 Revision: Page: 31 of 53 5.6.1 Short term connector storage Prior to installation the connectors are sensitive to environments where grit and dirt are present. To prevent ingress of the above, they should be stored in a clean dry area and be protected by bubble wrap or similar wrapping material.
Repackaging to prevent damage in transport In the event of a requirement to return any product back to the manufacturer ( Siemens Energy Subsea Connectors), it is recommended that the original dust/protective cap is fitted to the connector(s) after cleaning and care should be taken to protect the connector(s) with bubble wrap or similar wrapping materials to avoid any surface damage.
Receptacles must not be energised unless mated to a plug SpecTRON 10 Mk. II and 10+ connectors should be integrated and managed as part of a well-designed high voltage system with appropriate validation of system status and connections before energisation.
Hose Management and Routing Caution. Risk of material damage. • The maximum unsupported hose length in water during ROV operations for SpecTRON 10 Mk. II and 10+ harnesses (single and bundled) using AquaTRON 200 hose and 150 mm² Feltoflex cable is 75m •...
Document No: DOC0074 Issue Date: 22/10/2021 Revision: Page: 35 of 53 Figure 16 - Incorrectly routed AquaTRON (orange) and Gorilla (yellow) Hose Particular efforts should be made to support the hose where it exits the rear of the connector, particularly if the hose is to be routed immediately in an orientation contradictory to the connector (e.g.
Figure 22 - Permanent fixed ‘U’ former Clamping Siemens Energy recommends that plastic clamps with elastomer insert are used to secure the hose (such as a Stauff pipe clamps with the correct inside diameter, refer to section 4.3 for hose diameters).
Document No: DOC0074 Issue Date: 22/10/2021 Revision: Page: 38 of 53 Compliantly mounted connector Stauff clamp or similar Figure 24 - Potential clamping of hose on compliant connector 6.3.3 Dynamic Installation (SIT Layout) To aid the support of hose during SIT, formers can be produced to Siemens recommended design (See section 6.3.1) or to client specific design, and temporarily fixed to the client’s structures via the use of tie wraps or clamps.
Document No: DOC0074 Issue Date: 22/10/2021 Revision: Page: 39 of 53 Maximum free hanging hose without support in air is 5m Figure 26 - Example of support for immediate fall in hose routing Figure 26 shows an example of an immediate fall in routing from an inline plug. The image shows how the hose may be supported using formers mounted to the customer’s structure.
Figure 28 - Umbilical Receptacle Side on Termination (outside UTA) Siemens Energy offers multiple options for umbilical connector orientation within the UTA. The connector can be side on with the shroud facing left or right and the connector in the vertical position with the connector shroud facing down see figure 30.
Caution. Risk of material damage. • Any mating equipment used to mate the SpecTRON 10 Mk. II and 10+ connector pairs must be designed in accordance with the misalignment and interface guidance provided by Siemens Energy to avoid damage to the connector pair.
Document No: DOC0074 Issue Date: 22/10/2021 Revision: Page: 42 of 53 Two types of compliant mount are offered, Type 1 and 2. Type 1 is used for all connector orientations except when the mounting holes are horizontal (relative to gravity) of the connector, when Type 2 should be used. See section 5.5.1 for further details.
6.7.2 Test Levels The SpecTRON 10 Mk. II and 10+ connectors and penetrators are subjected to a complete FAT program as part of the manufacturing process. Penetrators will also be subjected to SIT testing after installation by Siemens Energy Connectors onto customer equipment (e.g. transformers, motors).
Page 44
Siemens Energy Connectors technical department should be consulted before starting any testing. • Partial Discharge Test o Please consult Siemens Energy Connectors technical department before carrying out partial discharge (PD) testing of harnesses, connectors and penetrators. 6.7.4 Pressure/Hydrostatic Tests •...
Document No: DOC0074 Issue Date: 22/10/2021 Revision: Page: 45 of 53 Disposal of waste products Safe disposal or recycling of waste/end of life product is recommended by correctly, observing and complying with area, regional, national, or international environmental legislation where applicable. To return waste packaging and/or end of life product to the manufacturer, contact the Product Safety Officer at subsea.connectors.productsafety.gb@siemens-energy.com.
Visible oil discharges from connector During normal operation of the SpecTRON 10 and 10+ wet mate pair, it is normal for a film of oil to be left on the receptacle pin after mating. There may also be some oil residue from assembly left in the compensation volume within the connector which may be visible during initial wetted testing.
Super Duplex stainless steel connectors and penetrators do not require a connection to a CP system. However, Siemens Energy supply CP strap with Super Duplex connectors, which can be used to provide electrical continuity during testing. The CP strap is manufactured in 316 stainless steel with a cross section of 16 mm , and a M6 spade terminal for connection to the CP system.
Document No: DOC0074 Issue Date: 22/10/2021 Revision: Page: 48 of 53 PRODUCT MAINTENANCE Danger! Risk of death from electric shock. • Connectors must not be de-mated whilst live. • Allow sufficient time for system to allow any residual voltage to discharge before de- mating connectors •...
Document No: DOC0074 Issue Date: 22/10/2021 Revision: Page: 49 of 53 Figure 31 - Disassembled receptacle protective cap 8.1.2 Receptacle Receptacle Pin Contact Screen Contact and Groove Figure 32 – Receptacle Components for drying and cleaning • Rinse the whole pin and the screen contact well with fresh water, for the pin tip recess a squeeze bottle can be use to spray in the recess to dislodge any contaminants.
Apply dielectric oil to the pin. Dielectric oil must be TD01 to avoid compatibility issue with elastomeric components. Siemens Energy advises that one mate should be performed with a Plug connector to provide sufficient coverage. (If no plugs are available contact Siemens Energy for TD01 oil) •...
Revision: Page: 51 of 53 To remove calcareous growth from Siemens Energy connectors, a solution of 50% Citric Acid is recommended. Figure 35 shows locations which should be avoided for power washing removal of calcite growth. All seawater exposed elastomeric and polymeric materials in Siemens Energy connectors have been tested against 50% Citric Acid and are suitable for intermittent exposure during cleaning operations through the life of the connector.
Document No: DOC0074 Issue Date: 22/10/2021 Revision: Page: 52 of 53 CUSTOMER COMMENTS/FEEDBACK Please complete the Sign Off section at the bottom of form to confirm each page of this document has been read and complied with in full. Originator Name and Initials (BLOCK CAPITALS) Date ...
Page 53
The requested performance features are binding only when they are expressly agreed upon in the concluded contract. Siemens Energy is a trademark licensed by Siemens AG. Unrestricted...
Need help?
Do you have a question about the SpecTRON 10 and is the answer not in the manual?
Questions and answers