Intex 10' Owner's Manual page 11

Round metal frame pool
Hide thumbs Also See for 10':
Table of Contents

Advertisement

Available languages
  • EN

Available languages

POOL SETUP (continued)
You may have purchased this pool with the Intex Krystal Clear™ filter pump. The pump has its own
separate set of installation instructions. First assemble your pool unit and then set up the filter pump.
Estimated assembly time 30-60 minutes. (Note the assembly time is only approximate and individual
assembly experience may vary.)
1. Liner preparation
• Find a flat, level location that is free and clear of stones, branches or other sharp objects that may
puncture the pool liner or cause injury.
• Open the carton containing the liner, joints, legs, etc., very carefully as this carton can be used to store
the pool during the winter months or when not in use.
• Take out the ground cloth (10) and spread it over the
cleared area. Then take out the liner (7) and spread it
out over the ground cloth, with the drain valve directed
towards the draining area. Place the drain valve away from
the house. Allow the sun to warm up the liner before
inserting the beams (6) into the sleeve openings.
IMPORTANT: Always set up the pool unit with at least 2
persons. Do not drag the liner across the ground as
this can cause liner damage and pool leakage (see
drawing 1).
• During the setup of this pool liner, point the hose connections or openings in the direction of the electric
power source. The outer edge of the pool should be within reach of the pump's electrical connection.
2. Frame assembly
• The frame pool's legs (8) and beams (6) fall into two groups. The larger diameters are the horizontal
beams that are slid (pushed) into the sleeve openings at the top of the liner. The smaller diameters are
the vertical legs. Both these legs and beams fit into the T-joints (3).
• Starting at any location, but always working in the same direction, push
the horizontal beam into the sleeve. Once the beam is centered take
one of the T- joints and using the connection pin (1), attach the joint to
one end of the beam by inserting the pin through the seal (2) and in the
pre-drilled holes. Repeat this procedure in a circular fashion until all the
beams and joints have been connected (see drawing 2.1).
The last joint connection may be difficult to complete. You can do
it though, if you first simultaneously raisethe last joint and beam
about 2 inches (5 cm). Now insert the beam into the joint while
lowering the pieces into position. The beam will easily slide into
the joint (see drawing 2.2). Ensure that the last joint is fully
connected before proceeding to connecting the legs.
SAVE THESE INSTRUCTIONS
(87IO) ROUND METAL FRAME POOL ENGLISH 7.5" X 10.3" PANTONE 295U 05/14/2014
English
87A
1
7
2.1
1
2
6
3
2.2
3
Page 7

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

12'14'15'16'18'24'

Table of Contents