Download Print this page

Advertisement

Quick Links

English
Installation instructions
IoT gateway indoor
1. General information
1.1. Intended use
Operational safety is only guaranteed if the product
is used as intended by the manufacturer. No liability
is assumed for damage caused by other applications.
Any modifications are only permitted with approval
from the manufacturer. Otherwise the manufacturer's
declaration is invalidated.
1.2. Safety instructions
If it is necessary to establish a new power connec-
tion, the installation and commissioning must only be
performed by trained qualified specialists. Only trained
qualified electricians may work on electrical systems.
They must be able to assess the work assigned to them
at all times, detect any potential sources of danger and
adopt appropriate safety measures. The installation
work must only be performed in a de-energised state.
Valid specifications and standards are to be observed.
2. Product description
2.1. Intended use
The ZENNER IoT Gateways use high-performance Lo-
RaWAN® technology, whose excellent building penetra-
tion and long-range network coverage generally ensure
the connectivity of IoT sensors even under challenging
environmental and installation conditions.
The Indoor Gateway is ideally suited for LoRa network
coverage within a building to receive the values of
sensors, some of which are difficult to access, on
several floors and in basements - without the need for
additional repeaters. The device can be used across
various sectors for a variety of IoT applications and is an
integral part of ZENNER IoT system solutions.
2.2. Scope of delivery
ZENNER IoT Indoor Gateway incl. integrated SIM
Mounting hardware (screws & dowels)
Installation and operating instructions
Declaration of conformity
5
3. Installation location
In order to gain optimum LoRaWAN network coverage,
an installation location which is as high as possible is
recommended due to various technological advan-
tages. For example, if an attic is available with potential
installation space, this installation location should be
preferred.
Note: In stairwells and hallways, the current building
regulations should be checked. It is not permitted to
install the product in the service room of the lift.
After selecting the preferred installation location, you
should test the mobile radio connection in this location
prior to attaching it.
4. Installation
4.1. Check whether cables are routed to the selected
installation point.
4.2.
Note the length of the power cable (range for
socket / junction box).
4.3.
Mark drilling holes on the wall according to
the hole spacing and use a spirit level (drilling
template attached) (ill. 1).
4.4.
Drill drilling holes, fit dowels and screws in the
holes (included in scope of delivery).
4.5.
Attach wall mounting bracket to the wall.
Ensure that the correct side of the wall moun-
ting bracket faces upwards. Pay attention to the
following illustration (ill. 1).
Tip: In the case of uneven walls, use washers.
ill. 1
4.6. Snap the gateway into the wall mounting
bracket. The electrical connection is then
established.
ill. 2

Advertisement

loading

Summary of Contents for Zenner IoT

  • Page 1 - without the need for additional repeaters. The device can be used across various sectors for a variety of IoT applications and is an integral part of ZENNER IoT system solutions. 2.2. Scope of delivery ill.
  • Page 2 5. Electrical connection 6. Commissioning Gateway with plug-in power supply The gateway starts immediately after insertion / con- ■ This variant is operated with a plug-in power sup- nection. ply. The electrical connection can be established by a The gateway passes through several phases during the laymen.
  • Page 3 Dimensions of gateway with plug-in power supply * ZENNER IoT Gateways (Indoor and Outdoor) are only compatible as standard with the ZENNER system landscape or ZE- NNER LoRa network server (LNS) by means of Plug’n’Play. The gateways are automatically detected in the backend and can subsequently be monitored and configured by the integrated Gateway Management System (GMS).
  • Page 4 8. Dismantling 8.1. Use a narrow flat head screwdriver to gently lift the far right lug on the assembly plate (wall mounting bracket). 8.2. Carefully pull the gateway downwards with an appropriate level of strength. 8.3. Remove the assembly plate from the wall and replace the gateway for a new one, if required.
  • Page 5: Important Note

    Federal Communication Commission Interference Statement This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications.