Download Print this page

Sealey PTB39003.V2 Instructions page 2

3 drawer heavy duty hang-on locker

Advertisement

4. ASSEMBLY
NOTE: Heavy item - get assistance to assemble.
4.1.
Securely attach hanger (fig.1 - item 4) using screws (fig.1 - item 3).
4.2.
Place neoprene pad spacers (fig.1 - item 6) (5 x 40 x 80) near lower edge of locker. (see fig.3). The spacer pads have adhesive backs
to enable fixing. See fig.3.
4.3.
Hang the locker onto the side of the cabinet.
4.4.
Attach connector (fig.1 - item 2) to the side of the locker using the bolts (fig.1 - item 1). See fig.2.
4.5.
To support shelves, insert shelf supports (fig.1 - item 9) at the desired height making sure that all pairs are at the same level. See fig.4.
Connecting piece
fig.2
fig.3
ENVIRONMENT PROTECTION
Recycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be sorted, taken to
a recycling centre and disposed of in a manner which is compatible with the environment. When the product becomes completely
unserviceable and requires disposal, drain any fluids (if applicable) into approved containers and dispose of the product and fluids
according to local regulations.
Note: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior
notice.
Important: No Liability is accepted for incorrect use of this product.
Warranty: Guarantee is 12 months from purchase date, proof of which is required for any claim.
Sealey Group, Kempson Way, Suffolk Business Park, Bury St Edmunds, Suffolk. IP32 7AR
01284 757500
© Jack Sealey Limited
M6 x 16 Hex bolt
01284 703534
sales@sealey.co.uk
Original Language Version
fig.4
www.sealey.co.uk
PTB39003.V2
Issue 1 25/11/20

Advertisement

loading