  • Page 1 GLCG BUFFER/BARRIER FLUID SYSTEM Operation Manual WWW.DDTOP.COM 1 / 10...
  • Page 2 You can download this instruction manual by entering the version number at www.ddtop.com. If the instrument is not operated in accordance with these instructions, the protection provided by the instrument may be impaired.
  • Page 3 Dandong Top Electronics Instrument (Group) Co., Ltd. has passed the ISO9001 quality system certification. The whole production process is carried out in strict accordance with the provisions of the quality system to provide the strongest guarantee for the quality of products and services. WWW.DDTOP.COM 3 / 10...
  • Page 4: Table Of Contents

    6.1 Installation tools ............................9 6.1.1 Wrenches, welding machines, etc. for process connections............9 6.2 Methods of use and operating procedures - Figure 4 ..............9 7 Disassembly ............................. 10 7.1 Warnings ..............................10 7.2 Waste removal ............................10 WWW.DDTOP.COM 4 / 10...
  • Page 5: Safety Tips

    1.3 Failure to comply with safety installation guidelines may result in death or serious injury. All operations described in these instructions must be performed by trained and qualified or end-user appointed personnel. 2 Product Description 2.1 Main product structure - Figure 1 WWW.DDTOP.COM 5 / 10...
  • Page 6: Operating Principle

    2.3 Packaging Please take the packaging waste to a special recycling facility. 2.4 Lifting for transport Please use qualified lifting equipment and lifting straps, and pay attention to safety. 2.5 Storage Storage temperature -20℃~40℃; storage humidity≤20%. WWW.DDTOP.COM 6 / 10...
  • Page 7: Main Technical Parameters

    Outlet Pressure: 0~5MPa, 0~8MPa, 0~10MPa, 0~16MPa Outlet Flow Rate: 125L/h, 160L/h, 200L/h Tank Capacity: 1.1 m3 Motor Power:2.2kW、4kW Power Supply:380VAC 50Hz System Material: 304 4 Outline drawing 隔离液充灌装置 型 号 GLCG-200/16 GLCG-200/16 出口流量 200L/h 200L/h 出口压力 0-16MPa 0-16MPa 电机电压/功率 380VAC/4.0KW 380VAC/4.0KW...
  • Page 8: Unpacking And Checking

    5.1.1 Check whether the Product Name Plate (Figure 3) is consistent with the information in the supply list. Figure 3 Product Name Plate 5.1.2 Check whether the quantity and material of each part are correct against the packing list. WWW.DDTOP.COM 8 / 10...
  • Page 9: Check The Contents

    1 when the demand is reached. 3. Close valve 4 and open valve 3. Fill the tank proportionally with fresh water and open valve 2. Stir the solution with compressed air, and close valve 3. WWW.DDTOP.COM 9 / 10...
  • Page 10: Disassembly

    7 Disassembly 7.1 Warnings Before disassembly, attention should be paid to hazardous process conditions, such as excessive pressure in the piping. 7.2 Waste removal Please follow the existing guidelines for waste disposal in your region. WWW.DDTOP.COM 10 / 10...